If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645103605000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]()  | 
| Location: 00/05-36-064-10W5/0 | |
| Location Alias: 00/05-36-64-10 W5M | |
| Location Alias 2: 00/05-36-064-10 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 10 | |
| Section: 36 | |
| County/Municipality: Big Lakes County | |
| Well Name: CPEC HZ SWANHS 5-36-64-10 | |
| Operator Name: Crescent Point Energy Corp. | |
| License Number: 0427000 | |
| License Date: 2010-12-03 | |
| License Status: Issued | |
| Spud Date: 2011-02-17 | |
| Final Drill Date: 2011-03-15 | |
| Well Total Depth: 4013.00 m | |
| Surface Hole Latitude: 54.578824 | |
| Surface Hole Longitude: -115.359098 | 
| Date | Event | 
|---|---|
| 2010-12-03 | Obtained License | 
| 2011-02-17 | Well Log Performed | 
| 2011-02-20 | Surface Casing Operation Performed | 
| 2011-03-02 | Direction Drilling Operation Performed - Horizontal | 
| 2011-03-08 | Intermediate Casing Operation Performed | 
| 2011-03-08 | Well Log Performed | 
| 2011-03-15 | Finished Drilling | 
| 2011-03-15 | Well Mode changed to Drilled and Cased | 
| 2011-03-18 | Liner Casing Operation Performed | 
| 2011-03-20 | Rig Released | 
| 2011-06-08 | Perforation Treatment Performed - Multi-Stage Fracture | 
| 2011-06-08 | Perforation Treatment Performed - Open-Hole Completion | 
| 2011-06-10 | Well Began Production | 
| 2011-06-10 | Well Fluid changed to Crude Oil | 
| 2011-06-10 | Well Mode changed to Flowing | 
For data sources see[3]
| Start Date | Depth (m) | Reason | 
|---|---|---|
| 2011-03-02 | 2074.00 | Horizontal | 
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | 
|---|---|---|---|---|
| 2011-06-08 | Multi-Stage Fracture | 3961.40 | 4008.00 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 3091.90 | 3225.10 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 2984.80 | 3091.90 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 2889.90 | 2984.80 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 2820.20 | 2889.90 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 2716.20 | 2820.20 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 2633.90 | 2716.20 | 0 | 
| 2011-06-08 | Open Hole/Barefoot Completion | 4008.00 | 4013.00 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 3870.30 | 3914.20 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 3801.30 | 3870.30 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 3744.70 | 3801.30 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 3665.30 | 3744.70 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 3556.90 | 3665.30 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 3463.70 | 3556.90 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 3344.40 | 3463.70 | 0 | 
| 2011-06-08 | Multi-Stage Fracture | 3225.10 | 3344.40 | 0 | 
For data sources see[5]
 
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) | 
|---|---|---|---|---|
| 2011 | 4242 | 0.0 | 0.0 | 0.0 | 
| 2012 | 4527 | 0.0 | 0.0 | 0.0 | 
| 2013 | 7289 | 0.0 | 0.0 | 0.0 | 
| 2014 | 7334 | 0.0 | 0.0 | 0.0 | 
| 2015 | 6698 | 0.0 | 0.0 | 0.0 | 
| 2016 | 5443 | 0.0 | 0.0 | 0.0 | 
| 2017 | 7730 | 0.0 | 0.0 | 0.0 | 
| 2018 | 8414 | 0.0 | 0.0 | 0.0 | 
| 2019 | 8556 | 0.0 | 0.0 | 0.0 | 
| 2020 | 2183 | 0.0 | 0.0 | 0.0 | 
For data sources see[6]