If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645101001000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.516177,"lon":-115.440193,"icon":""}]} |
| Location: 00/01-10-064-10W5/0 | |
| Location Alias: 00/01-10-64-10 W5M | |
| Location Alias 2: 00/01-10-064-10 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 10 | |
| Section: 10 | |
| County/Municipality: Big Lakes County | |
| Well Name: ACCEL JUDYCK 1-10-64-10 | |
| Operator Name: ACCEL Energy Canada Limited | |
| License Number: 0433021 | |
| License Date: 2011-04-14 | |
| License Status: Suspension | |
| Spud Date: 2011-05-11 | |
| Final Drill Date: 2011-05-27 | |
| Well Total Depth: 3883.00 m | |
| Surface Hole Latitude: 54.516177 | |
| Surface Hole Longitude: -115.440193 |
| Date | Event |
|---|---|
| 2011-04-14 | Obtained License |
| 2011-05-13 | Surface Casing Operation Performed |
| 2011-05-18 | Direction Drilling Operation Performed - Horizontal |
| 2011-05-21 | Intermediate Casing Operation Performed |
| 2011-05-27 | Finished Drilling |
| 2011-05-27 | Well Log Performed |
| 2011-05-27 | Well Mode changed to Drilled and Cased |
| 2011-05-28 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-05-29 | Rig Released |
| 2011-07-22 | Well Log Performed |
| 2011-08-10 | Liner Casing Operation Performed |
| 2011-08-10 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-09-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-09-05 | Well Began Production |
| 2011-09-05 | Well Fluid changed to Crude Oil |
| 2011-09-05 | Well Mode changed to Pumping |
| 2013-09-01 | Well Fluid changed to Crude Oil |
| 2013-09-01 | Well Mode changed to Suspended |
| 2014-01-06 | Well Fluid changed to Crude Oil |
| 2014-01-06 | Well Mode changed to Pumping |
| 2016-12-01 | Well Fluid changed to Crude Oil |
| 2016-12-01 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-05-18 | 2161.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-05-28 | Open Hole/Barefoot Completion | 2683.00 | 3883.00 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 3267.90 | 3268.00 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 3177.90 | 3178.00 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 3100.00 | 3100.10 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 3003.90 | 3004.00 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 2924.00 | 2924.10 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 2835.20 | 2835.30 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 2782.20 | 2782.30 | 0 |
| 2011-08-10 | Open Hole/Barefoot Completion | 3865.00 | 3883.00 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 3860.50 | 3860.60 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 3805.50 | 3805.60 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 3712.50 | 3712.60 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 3620.10 | 3620.20 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 3539.80 | 3539.90 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 3448.40 | 3448.50 | 0 |
| 2011-09-03 | Multi-Stage Fracture | 3357.70 | 3357.80 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 1874 | 0.0 | 0.0 | 0.0 |
| 2012 | 4467 | 0.0 | 0.0 | 0.0 |
| 2013 | 53 | 0.0 | 0.0 | 0.0 |
| 2014 | 8426 | 0.0 | 0.0 | 0.0 |
| 2015 | 8276 | 0.0 | 0.0 | 0.0 |
| 2016 | 4361 | 0.0 | 0.0 | 0.0 |
For data sources see[6]