Well ID: 0645100802000
Loading map...
Location: 00/02-08-064-10W5/0
Location Alias: 00/02-08-64-10 W5M
Location Alias 2: 00/02-08-064-10 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 10
Section: 08
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 2-8-64-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0021557
License Date: 1961-10-19
License Status: Suspension
Spud Date: 1961-10-28
Final Drill Date: 1961-11-23
Well Total Depth: 2622.20 m
Surface Hole Latitude: 54.517759
Surface Hole Longitude: -115.472573

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-10-19 Obtained License
1961-11-23 Finished Drilling
1961-11-23 Well Mode changed to Drilled and Cased
1961-11-25 Production Casing Operation Performed
1961-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-11-30 Perforation Treatment Performed - Bullet Perforation
1961-12-01 Well Began Production
1961-12-01 Well Fluid changed to Crude Oil
1961-12-01 Well Mode changed to Flowing
1973-11-13 Perforation Treatment Performed - Jet Perforation
1974-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-27 Well Fluid changed to Crude Oil
1978-07-27 Well Mode changed to Gas Lift
1979-08-27 Perforation Treatment Performed - Jet Perforation
1979-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-21 Perforation Treatment Performed - Jet Perforation
1985-03-21 Well Log Performed
1985-03-23 Perforation Treatment Performed - Fractured
1995-10-24 Perforation Treatment Performed - Cement Squeeze
1995-10-28 Perforation Treatment Performed - Jet Perforation
1995-10-30 Perforation Treatment Performed - Cement Squeeze
1995-11-01 Well Fluid changed to Crude Oil
1995-11-01 Well Mode changed to Suspended
1995-11-05 Perforation Treatment Performed - Cement Squeeze
1995-11-12 Perforation Treatment Performed - Jet Perforation
1995-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-01 Well Began Injection
1995-12-01 Well Fluid changed to Solvent
1995-12-01 Well Type changed to Injection
1996-03-14 Well Log Performed
1996-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-30 Well Log Performed
1999-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-07 Perforation Treatment Performed - Jet Perforation
2005-10-07 Well Log Performed
2005-10-08 Well Log Performed
2005-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-12-08 Well Fluid changed to Solvent
2009-12-08 Well Mode changed to Suspended
2009-12-08 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-11-30 Bullet Perforation 2557.60 2563.10 3
1979-08-27 Perforation 2536.90 2538.40 7
1979-08-27 Perforation 2540.50 2541.40 7
1979-08-30 Acid Treatment 2536.90 2544.50 0
1985-03-21 Perforation 2536.80 2540.50 7
1985-03-21 Perforation 2542.00 2544.50 7
1985-03-21 Perforation 2546.60 2553.00 7
1985-03-21 Perforation 2553.30 2563.10 7
1985-03-21 Perforation 2565.50 2580.10 7
1985-03-21 Perforation 2588.70 2590.50 7
1985-03-23 Fracture 2536.80 2590.50 0
1961-11-30 Acid Treatment 2557.60 2563.10 0
1995-10-24 Cement Squeeze 2562.50 2563.10 0
1995-10-28 Perforation 2562.70 2563.00 12
1995-10-30 Cement Squeeze 2556.00 2563.00 0
1995-11-05 Cement Squeeze 2536.80 2547.00 0
1995-11-12 Perforation 2554.50 2561.00 7
1995-11-13 Acid Treatment 2554.50 2561.00 0
1996-10-04 Acid Treatment 2565.50 2590.50 0
1999-09-04 Acid Treatment 2547.00 2590.50 0
1999-09-09 Acid Treatment 2547.00 2590.50 0
2002-07-31 Acid Treatment 2547.00 2590.50 0
1973-11-13 Perforation 2536.90 2538.40 3
2005-10-07 Perforation 2542.00 2549.00 3
2005-10-09 Acid Treatment 2542.00 2549.00 0
2008-02-08 Acid Treatment 2542.00 2549.00 0
2008-02-08 Acid Treatment 2554.50 2561.00 0
1973-11-13 Perforation 2540.50 2541.40 3
1973-11-13 Perforation 2542.00 2544.50 3
1973-11-13 Perforation 2547.50 2550.60 3
1973-11-13 Perforation 2552.40 2553.00 3
1973-11-13 Perforation 2554.50 2556.40 3
1974-05-30 Acid Treatment 2536.90 2554.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6522 0.0 0.0 0.0
1968 7121 0.0 0.0 0.0
1969 7476 0.0 0.0 0.0
1970 5654 0.0 0.0 0.0
1971 6433 0.0 0.0 0.0
1972 5767 0.0 0.0 0.0
1973 8041 0.0 0.0 0.0
1974 6631 0.0 0.0 0.0
1975 4519 0.0 0.0 0.0
1976 3826 0.0 0.0 0.0
1977 5159 0.0 0.0 0.0
1978 4817 0.0 0.0 0.0
1979 6338 0.0 0.0 0.0
1980 4436 0.0 0.0 0.0
1981 6198 0.0 0.0 0.0
1982 7447 0.0 0.0 0.0
1983 8284 0.0 0.0 0.0
1984 8663 0.0 0.0 0.0
1985 7744 0.0 0.0 0.0
1986 8462 0.0 0.0 0.0
1987 8695 0.0 0.0 0.0
1988 8496 0.0 0.0 0.0
1989 8483 0.0 0.0 0.0
1990 8600 0.0 0.0 0.0
1991 8270 0.0 0.0 0.0
1992 8475 0.0 0.0 0.0
1993 8599 0.0 0.0 0.0
1994 6185 0.0 0.0 0.0
1995 4808 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0

For data sources see[5]

References