X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645090514000

Well Details

Well ID: 0645090514000
Loading map...
Location: 00/14-05-064-09W5/0
Location Alias: 00/14-05-64-09 W5M
Location Alias 2: 00/14-05-064-09 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 09
Section: 05
County/Municipality: Big Lakes County
Well Name: CPEC HZ JUDYCK 14-5-64-9
Operator Name: Crescent Point Energy Corp.
License Number: 0438054
License Date: 2011-10-27
License Status: Amended
Spud Date: 2011-12-12
Final Drill Date: 2012-01-03
Well Total Depth: 4510.00 m
Surface Hole Latitude: 54.513654
Surface Hole Longitude: -115.359672

For data sources see[1][2]

Well History

Date Event
2011-10-27 Obtained License
2011-12-14 Surface Casing Operation Performed
2011-12-15 Well Log Performed
2011-12-19 Direction Drilling Operation Performed - Deviate
2011-12-21 Direction Drilling Operation Performed - Horizontal
2011-12-24 Intermediate Casing Operation Performed
2012-01-03 Finished Drilling
2012-01-03 Well Mode changed to Drilled and Cased
2012-01-06 Liner Casing Operation Performed
2012-01-07 Rig Released
2012-02-01 Well Began Production
2012-02-01 Well Fluid changed to Crude Oil
2012-02-01 Well Mode changed to Pumping
2012-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-15 Perforation Treatment Performed - Open-Hole Completion
2012-02-26 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-19 2216.70 Deviate (5 - 79 degrees)
2011-12-21 2620.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-15 Multi-Stage Fracture 2793.10 2793.20 0
2012-02-15 Multi-Stage Fracture 3888.30 3888.40 0
2012-02-15 Multi-Stage Fracture 4007.50 4007.60 0
2012-02-15 Multi-Stage Fracture 4127.80 4127.90 0
2012-02-15 Multi-Stage Fracture 4247.40 4247.50 0
2012-02-15 Multi-Stage Fracture 4366.30 4366.40 0
2012-02-15 Multi-Stage Fracture 4485.00 4485.10 0
2012-02-15 Open Hole/Barefoot Completion 4490.00 4510.00 0
2012-02-15 Multi-Stage Fracture 2935.40 2935.50 0
2012-02-15 Multi-Stage Fracture 3054.30 3054.40 0
2012-02-15 Multi-Stage Fracture 3172.10 3172.20 0
2012-02-15 Multi-Stage Fracture 3291.90 3292.00 0
2012-02-15 Multi-Stage Fracture 3412.20 3412.30 0
2012-02-15 Multi-Stage Fracture 3531.30 3531.40 0
2012-02-15 Multi-Stage Fracture 3649.60 3649.70 0
2012-02-15 Multi-Stage Fracture 3769.70 3769.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6794 0.0 0.0 0.0
2013 8665 0.0 0.0 0.0
2014 8002 0.0 0.0 0.0
2015 8614 0.0 0.0 0.0
2016 8659 0.0 0.0 0.0
2017 8605 0.0 0.0 0.0
2018 7590 0.0 0.0 0.0
2019 8386 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References