If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0645090501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.502443,"lon":-115.330835,"icon":""}]} |
Location: 00/01-05-064-09W5/0 | |
Location Alias: 00/01-05-64-09 W5M | |
Location Alias 2: 00/01-05-064-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 064 | |
Meridian: 5 | |
Range: 09 | |
Section: 05 | |
County/Municipality: Big Lakes County | |
Well Name: CPEC JUDYCK 1-5-64-9 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0419471 | |
License Date: 2010-03-31 | |
License Status: Suspension | |
Spud Date: 2010-05-15 | |
Final Drill Date: 2010-05-31 | |
Well Total Depth: 2562.00 m | |
Surface Hole Latitude: 54.502443 | |
Surface Hole Longitude: -115.330835 |
Date | Event |
---|---|
2010-03-31 | Obtained License |
2010-05-16 | Surface Casing Operation Performed |
2010-05-19 | Direction Drilling Operation Performed - Deviate |
2010-05-20 | Direction Drilling Operation Performed - Horizontal |
2010-05-23 | Intermediate Casing Operation Performed |
2010-05-28 | Well Log Performed |
2010-05-30 | Liner Casing Operation Performed |
2010-05-31 | Finished Drilling |
2010-05-31 | Rig Released |
2010-05-31 | Well Mode changed to Drilled and Cased |
2010-06-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-06-05 | Perforation Treatment Performed - Open-Hole Completion |
2010-06-07 | Well Log Performed |
2010-06-16 | Well Began Production |
2010-06-16 | Well Fluid changed to Crude Oil |
2010-06-16 | Well Mode changed to Pumping |
2019-03-01 | Well Fluid changed to Crude Oil |
2019-03-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-05-19 | 1244.30 | Deviate (5 - 79 degrees) |
2010-05-20 | 1559.90 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-06-05 | Open Hole/Barefoot Completion | 2552.00 | 2562.00 | 0 |
2010-06-05 | Multi-Stage Fracture | 2415.30 | 2415.40 | 0 |
2010-06-05 | Multi-Stage Fracture | 2512.60 | 2512.70 | 0 |
2010-06-05 | Multi-Stage Fracture | 1696.80 | 1696.90 | 0 |
2010-06-05 | Multi-Stage Fracture | 1782.50 | 1782.60 | 0 |
2010-06-05 | Multi-Stage Fracture | 1879.30 | 1879.40 | 0 |
2010-06-05 | Multi-Stage Fracture | 1964.90 | 1965.00 | 0 |
2010-06-05 | Multi-Stage Fracture | 2062.00 | 2062.10 | 0 |
2010-06-05 | Multi-Stage Fracture | 2147.30 | 2147.40 | 0 |
2010-06-05 | Multi-Stage Fracture | 2232.60 | 2232.70 | 0 |
2010-06-05 | Multi-Stage Fracture | 2329.80 | 2329.90 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 3237 | 0.0 | 0.0 | 0.0 |
2011 | 7335 | 0.0 | 0.0 | 0.0 |
2012 | 7930 | 0.0 | 0.0 | 0.0 |
2013 | 5129 | 0.0 | 0.0 | 0.0 |
2014 | 7543 | 0.0 | 0.0 | 0.0 |
2015 | 8500 | 0.0 | 0.0 | 0.0 |
2016 | 5457 | 0.0 | 0.0 | 0.0 |
For data sources see[6]