If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0644171805002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/05-18-064-17W4/2 | |
| Location Alias: 00/05-18-64-17 W4M | |
| Location Alias 2: 00/05-18-064-17 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 18 | |
| County/Municipality: Buffalo Lake Metis Settlement | |
| Well Name: ACL FIGURE LAKE 5-18-64-17 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0180171 | |
| License Date: 1995-08-21 | |
| License Status: Abandoned | |
| Spud Date: 1995-09-05 | |
| Final Drill Date: 1995-09-07 | |
| Well Total Depth: 644.50 m | |
| Surface Hole Latitude: 54.533459 | |
| Surface Hole Longitude: -112.574516 |
| Date | Event |
|---|---|
| 1995-08-21 | Obtained License |
| 1995-09-06 | Surface Casing Operation Performed |
| 1995-09-07 | Finished Drilling |
| 1995-09-07 | Lost Circulation Occurred |
| 1995-09-07 | Well Log Performed |
| 1995-09-07 | Well Mode changed to Drilled and Cased |
| 1995-09-08 | Production Casing Operation Performed |
| 1995-09-08 | Rig Released |
| 1995-09-10 | Perforation Treatment Performed - Open-Hole Completion |
| 1996-08-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-08-28 | Perforation Treatment Performed - Jet Perforation |
| 1996-08-28 | Plug Back Performed |
| 1996-08-28 | Well Began Production |
| 1996-08-28 | Well Fluid changed to Gas |
| 1996-08-28 | Well Mode changed to Flowing |
| 1997-12-09 | Perforation Treatment Performed - Jet Perforation |
| 1998-03-10 | Well Fluid changed to Gas |
| 1998-03-10 | Well Mode changed to Suspended |
| 2002-12-23 | Well Log Performed |
| 2003-01-04 | Perforation Treatment Performed - Jet Perforation |
| 2003-01-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2003-01-05 | Plug Back Performed |
| 2003-01-05 | Well Fluid changed to Gas |
| 2003-01-05 | Well Mode changed to Abandoned Zone |
| 2003-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2003-01-06 | Perforation Treatment Performed - Jet Perforation |
| 2003-01-06 | Plug Back Performed |
| 2003-01-06 | Well Log Performed |
| 2017-01-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-01-25 | Plug Back Performed |
| 2017-01-25 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1995-09-10 | Open Hole/Barefoot Completion | 644.00 | 644.50 | 0 |
| 2017-01-25 | Packing Device Capped w/Cement | 467.00 | 475.00 | 0 |
| 1996-08-28 | Packing Device Capped w/Cement | 632.00 | 640.00 | 0 |
| 1996-08-28 | Perforation | 484.50 | 485.00 | 13 |
| 1996-08-28 | Perforation | 487.00 | 489.00 | 13 |
| 1997-12-09 | Perforation | 552.50 | 557.00 | 13 |
| 2003-01-04 | Perforation | 618.00 | 619.00 | 17 |
| 2003-01-05 | Packing Device Capped w/Cement | 607.00 | 615.00 | 0 |
| 2003-01-06 | Packing Device Capped w/Cement | 540.00 | 548.00 | 0 |
| 2003-01-06 | Perforation | 501.00 | 502.00 | 17 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1996 | 2998 | 0.0 | 0.0 | 0.0 |
| 1997 | 3316 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1995-09-07 | Lost Circulation | 644.00 | 644.00 |
| 2017-01-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]