If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0636081816000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.446017,"lon":-119.164915,"icon":""}]} |
| Location: 00/16-18-063-08W6/0 | |
| Location Alias: 00/16-18-63-08 W6M | |
| Location Alias 2: 00/16-18-063-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 063 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 18 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: JUPITER HZ ROUTE 16-18-63-8 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0465697 | |
| License Date: 2014-03-13 | |
| License Status: Amended | |
| Spud Date: 2014-06-04 | |
| Final Drill Date: 2014-07-22 | |
| Well Total Depth: 5151.00 m | |
| Surface Hole Latitude: 54.446017 | |
| Surface Hole Longitude: -119.164915 |
| Date | Event |
|---|---|
| 2014-03-13 | Obtained License |
| 2014-06-05 | Lost Circulation Occurred |
| 2014-06-07 | Surface Casing Operation Performed |
| 2014-06-08 | Well Log Performed |
| 2014-06-09 | Direction Drilling Operation Performed - Deviate |
| 2014-06-10 | Lost Circulation Occurred |
| 2014-06-19 | Well Log Performed |
| 2014-06-24 | Intermediate Casing Operation Performed |
| 2014-07-01 | Direction Drilling Operation Performed - Horizontal |
| 2014-07-02 | Well Log Performed |
| 2014-07-22 | Finished Drilling |
| 2014-07-22 | Well Log Performed |
| 2014-07-22 | Well Mode changed to Drilled and Cased |
| 2014-07-23 | Liner Casing Operation Performed |
| 2014-07-23 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-07-25 | Liner Casing Operation Performed |
| 2014-07-26 | Rig Released |
| 2015-02-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-02-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-02-19 | Well Fluid changed to Gas |
| 2015-02-19 | Well Mode changed to Testing |
| 2015-03-01 | Well Began Production |
| 2015-03-01 | Well Fluid changed to Gas |
| 2015-03-01 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-06-09 | 722.50 | Deviate (5 - 79 degrees) |
| 2014-07-01 | 3441.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-07-23 | Open Hole/Barefoot Completion | 5136.00 | 5151.00 | 0 |
| 2015-02-13 | Multi-Stage Fracture | 4506.50 | 4506.60 | 0 |
| 2015-02-13 | Multi-Stage Fracture | 4429.80 | 4429.90 | 0 |
| 2015-02-13 | Multi-Stage Fracture | 4227.80 | 4362.00 | 0 |
| 2015-02-13 | Multi-Stage Fracture | 4021.70 | 4165.10 | 0 |
| 2015-02-14 | Multi-Stage Fracture | 3822.20 | 3955.50 | 0 |
| 2015-02-14 | Multi-Stage Fracture | 3619.60 | 3756.40 | 0 |
| 2015-02-14 | Multi-Stage Fracture | 3417.80 | 3556.50 | 0 |
| 2015-02-12 | Multi-Stage Fracture | 5086.70 | 5086.80 | 0 |
| 2015-02-12 | Multi-Stage Fracture | 5019.20 | 5019.30 | 0 |
| 2015-02-12 | Multi-Stage Fracture | 4944.80 | 4944.90 | 0 |
| 2015-02-12 | Multi-Stage Fracture | 4868.80 | 4868.90 | 0 |
| 2015-02-12 | Multi-Stage Fracture | 4792.60 | 4792.70 | 0 |
| 2015-02-12 | Multi-Stage Fracture | 4718.10 | 4718.20 | 0 |
| 2015-02-12 | Multi-Stage Fracture | 4651.30 | 4651.40 | 0 |
| 2015-02-13 | Multi-Stage Fracture | 4583.70 | 4583.80 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-02-12 | 2015-02-14 | 3,261 | 10,627 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 84.8002 | N/A | |||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 8.3854 | N/A | ||
| 50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 2.8269 | N/A | ||
| Oil Plus | Calfrac | Quartz | 14808-60-7 | 100 | 3.7274 | N/A | ||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0133 | N/A | |
| Water | 7732-18-5 | 100 | 0.0134 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0774 | N/A | |
| DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0882 | N/A | |
| Ethoxylated phenolic resin | 8300 | 100 | 0.0888 | N/A | ||||
| Isobutyl ketone | 8300 | 100 | 0.0882 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0915 | N/A | ||||
| Organic acid salts 1 | 8300 | 100 | 0.0882 | N/A | ||||
| Organic acid salts 2 | 8300 | 100 | 0.0886 | N/A | ||||
| Organic acid salts 3 | 8300 | 100 | 0.0888 | N/A | ||||
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0812 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-01-23 | 2015-02-14 | Surface Water - River | 9112 |
| 2015-02-14 | 2015-02-14 | Surface Water - Runoff | 670 |
| 2015-02-14 | 2015-02-14 | Recycled Fracturing Water (treated at well site) | 175 |
| 2015-02-13 | 2015-02-14 | Recycled Fracturing Water (treated at well site) | 670 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 6718 | 0.0 | 0.0 | 0.0 |
| 2016 | 4109 | 0.0 | 0.0 | 0.0 |
| 2017 | 4714 | 0.0 | 0.0 | 0.0 |
| 2018 | 2615 | 0.0 | 0.0 | 0.0 |
| 2019 | 1671 | 0.0 | 0.0 | 0.0 |
| 2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-06-05 | Lost Circulation | 145.00 | 214.00 |
| 2014-06-10 | Lost Circulation | 1523.00 | 1523.00 |
| 2015-03-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]