X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635232505000

Well Details

Well ID: 0635232505000
Loading map...
Location: 00/05-25-063-23W5/0
Location Alias: 00/05-25-63-23 W5M
Location Alias 2: 00/05-25-063-23 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 23
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK HZ WAHIGAN 5-25-63-23
Operator Name: Tangle Creek Energy Ltd.
License Number: 0420993
License Date: 2010-06-07
License Status: Issued
Spud Date: 2010-06-26
Final Drill Date: 2010-07-19
Well Total Depth: 3510.00 m
Surface Hole Latitude: 54.477926
Surface Hole Longitude: -117.328241

For data sources see[1][2]

Well History

Date Event
2010-06-07 Obtained License
2010-06-28 Surface Casing Operation Performed
2010-07-02 Well Log Performed
2010-07-03 Direction Drilling Operation Performed - Horizontal
2010-07-12 Intermediate Casing Operation Performed
2010-07-12 Well Log Performed
2010-07-19 Finished Drilling
2010-07-19 Well Mode changed to Drilled and Cased
2010-07-21 Well Log Performed
2010-07-22 Liner Casing Operation Performed
2010-07-23 Rig Released
2010-07-31 Perforation Treatment Performed - Multi-Stage Fracture
2010-07-31 Perforation Treatment Performed - Open-Hole Completion
2010-09-20 Well Began Production
2010-09-20 Well Fluid changed to Crude Oil
2010-09-20 Well Mode changed to Flowing
2010-10-01 Well Fluid changed to Crude Oil
2010-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-03 1857.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-07-31 Open Hole/Barefoot Completion 3504.30 3510.00 0
2010-07-31 Multi-Stage Fracture 2708.50 2708.60 0
2010-07-31 Multi-Stage Fracture 2615.00 2615.10 0
2010-07-31 Multi-Stage Fracture 2518.70 2518.80 0
2010-07-31 Multi-Stage Fracture 2436.00 2436.10 0
2010-07-31 Multi-Stage Fracture 2354.00 2354.10 0
2010-07-31 Multi-Stage Fracture 3495.00 3495.10 0
2010-07-31 Multi-Stage Fracture 3379.70 3379.80 0
2010-07-31 Multi-Stage Fracture 3251.90 3252.00 0
2010-07-31 Multi-Stage Fracture 3155.50 3155.60 0
2010-07-31 Multi-Stage Fracture 3074.70 3074.80 0
2010-07-31 Multi-Stage Fracture 2984.10 2984.20 0
2010-07-31 Multi-Stage Fracture 2887.30 2887.40 0
2010-07-31 Multi-Stage Fracture 2804.70 2804.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2233 0.0 0.0 0.0
2011 7905 0.0 0.0 0.0
2012 6670 0.0 0.0 0.0
2013 8526 0.0 0.0 0.0
2014 8670 0.0 0.0 0.0
2015 6685 0.0 0.0 0.0
2016 8310 0.0 0.0 0.0
2017 8399 0.0 0.0 0.0
2018 4617 0.0 0.0 0.0
2019 5906 0.0 0.0 0.0
2020 839 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-07-31 No Incident Encountered 0.00 0.00

For data sources see[7]

References