If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635222702020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 02/02-27-063-22W5/0 | |
Location Alias: 02/02-27-63-22 W5M | |
Location Alias 2: 02/02-27-063-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 22 | |
Section: 27 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TRILOGY ET AL 102 WAHIGAN 2-27-63-22 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0402735 | |
License Date: 2008-10-23 | |
License Status: Suspension | |
Spud Date: 2008-11-14 | |
Final Drill Date: 2008-11-21 | |
Well Total Depth: 2220.00 m | |
Surface Hole Latitude: 54.475930 | |
Surface Hole Longitude: -117.238359 |
Date | Event |
---|---|
2008-10-23 | Obtained License |
2008-11-15 | Surface Casing Operation Performed |
2008-11-21 | Finished Drilling |
2008-11-21 | Well Mode changed to Drilled and Cased |
2008-11-22 | Well Log Performed |
2008-11-23 | Production Casing Operation Performed |
2008-11-24 | Rig Released |
2009-01-17 | Well Log Performed |
2009-01-18 | Perforation Treatment Performed - Jet Perforation |
2009-01-18 | Well Log Performed |
2009-02-09 | Perforation Treatment Performed - Jet Perforation |
2009-02-09 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2009-02-09 | Plug Back Performed |
2009-02-09 | Well Mode changed to Abandoned Zone |
2009-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-02 | Plug Back Performed |
2009-03-06 | Perforation Treatment Performed - Jet Perforation |
2009-03-07 | Well Log Performed |
2010-02-06 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-01-18 | Perforation | 1972.00 | 1974.30 | 17 |
2009-02-09 | Packing Dev Cpd w/Res-Gyp Cem | 1968.00 | 1971.00 | 0 |
2009-02-09 | Perforation | 1961.00 | 1962.50 | 17 |
2009-03-02 | Packing Device Capped w/Cement | 1942.00 | 1950.00 | 0 |
2009-03-06 | Perforation | 1893.00 | 1897.50 | 17 |
2009-03-06 | Perforation | 1873.50 | 1878.00 | 17 |
2010-02-06 | Fracture | 1893.00 | 1897.50 | 0 |
2010-02-06 | Fracture | 1873.00 | 1878.00 | 0 |
For data sources see[4]