If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0635200503022 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 02/03-05-063-20W5/2 | |
| Location Alias: 02/03-05-63-20 W5M | |
| Location Alias 2: 02/03-05-063-20 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 063 | |
| Meridian: 5 | |
| Range: 20 | |
| Section: 05 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TRILOGY 102 HZ KAYBOBS 3-5-63-20 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0438723 | |
| License Date: 2011-11-10 | |
| License Status: Suspension | |
| Spud Date: 2011-12-16 | |
| Final Drill Date: 2012-01-09 | |
| Well Total Depth: 3634.00 m | |
| Surface Hole Latitude: 54.429175 | |
| Surface Hole Longitude: -116.996454 |
| Date | Event |
|---|---|
| 2011-11-10 | Obtained License |
| 2011-12-16 | Direction Drilling Operation Performed - Horizontal |
| 2011-12-26 | Intermediate Casing Operation Performed |
| 2012-01-09 | Finished Drilling |
| 2012-01-09 | Well Log Performed |
| 2012-01-09 | Well Mode changed to Drilled and Cased |
| 2012-01-11 | Liner Casing Operation Performed |
| 2012-01-12 | Rig Released |
| 2012-01-15 | Well Log Performed |
| 2012-01-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-01-22 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-01-30 | Well Began Production |
| 2012-01-30 | Well Fluid changed to Crude Oil |
| 2012-01-30 | Well Mode changed to Flowing |
| 2013-02-13 | Well Fluid changed to Crude Oil |
| 2013-02-13 | Well Mode changed to Pumping |
| 2016-02-24 | Well Fluid changed to Crude Oil |
| 2016-02-24 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-12-16 | 1795.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-01-22 | Open Hole/Barefoot Completion | 3630.00 | 3634.00 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 3013.10 | 3101.90 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 2938.60 | 3013.00 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 2865.20 | 2938.50 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 2785.40 | 2865.10 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 2711.20 | 2785.30 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 2629.90 | 2711.10 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 2556.00 | 2628.90 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 2482.90 | 2555.90 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 2409.90 | 2482.80 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 2336.80 | 2409.80 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 3609.40 | 3634.00 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 2253.00 | 2336.70 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 2194.30 | 2252.90 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 3555.30 | 3609.30 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 3479.30 | 3555.20 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 3405.70 | 3479.20 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 3332.20 | 3405.60 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 3244.40 | 3332.10 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 3169.80 | 3244.30 | 0 |
| 2012-01-22 | Multi-Stage Fracture | 3102.00 | 3169.70 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 251 | 0.0 | 0.0 | 0.0 |
| 2013 | 1895 | 0.0 | 0.0 | 0.0 |
| 2014 | 5961 | 0.0 | 0.0 | 0.0 |
| 2015 | 1453 | 0.0 | 0.0 | 0.0 |
For data sources see[6]