X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635200502002

Well Details

Well ID: 0635200502002
Loading map...
Location: 00/02-05-063-20W5/2
Location Alias: 00/02-05-63-20 W5M
Location Alias 2: 00/02-05-063-20 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 20
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN ET AL KAYBOBS 2-5-63-20
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0195235
License Date: 1996-12-16
License Status: Abandoned
Spud Date: 1996-12-19
Final Drill Date: 1997-01-01
Well Total Depth: 2073.00 m
Surface Hole Latitude: 54.417594
Surface Hole Longitude: -116.986815

For data sources see[1][2]

Well History

Date Event
1996-12-16 Obtained License
1996-12-20 Surface Casing Operation Performed
1997-01-01 Finished Drilling
1997-01-01 Well Log Performed
1997-01-01 Well Mode changed to Drilled and Cased
1997-01-02 Drill Stem Test Performed
1997-01-02 Well Log Performed
1997-01-03 Drill Stem Test Performed
1997-01-04 Production Casing Operation Performed
1997-01-04 Rig Released
1997-01-10 Perforation Treatment Performed - Jet Perforation
1997-01-10 Well Log Performed
1997-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-15 Perforation Treatment Performed - Jet Perforation
1997-01-15 Well Log Performed
1997-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-07 Perforation Treatment Performed - Jet Perforation
1999-02-07 Well Mode changed to Drilled and Cased
1999-02-08 Perforation Treatment Performed - Fractured
2011-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-23 Plug Back Performed
2011-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-24 Plug Back Performed
2011-02-24 Well Mode changed to Abandoned Zone
2011-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-25 Perforation Treatment Performed - Jet Perforation
2011-02-25 Perforation Treatment Performed - Remedial Casing
2011-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-26 Perforation Treatment Performed - Jet Perforation
2011-02-26 Perforation Treatment Performed - Remedial Casing
2011-02-28 Perforation Treatment Performed - Cement Plug
2011-02-28 Perforation Treatment Performed - Remedial Casing
2011-02-28 Plug Back Performed
2011-03-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-01-10 Perforation 2017.00 2019.00 18
2011-02-25 Remedial Casing Cementing 979.00 981.00 0
2011-02-25 Perforation 979.00 981.00 13
2011-02-25 Packing Device Capped w/Cement 967.00 976.00 0
2011-02-25 Perforation 600.00 601.00 1
2011-02-26 Packing Device Capped w/Cement 416.00 424.00 0
2011-02-26 Remedial Casing Cementing 427.00 428.00 0
2011-02-26 Perforation 370.00 371.00 1
2011-02-26 Remedial Casing Cementing 463.00 464.00 0
2011-02-26 Perforation 285.00 286.00 1
2011-02-26 Packing Device Capped w/Cement 360.00 368.00 0
1997-01-11 Acid Treatment 2017.00 2019.00 0
2011-02-26 Perforation 427.00 428.00 1
2011-02-26 Perforation 483.00 484.00 1
2011-02-26 Packing Device Capped w/Cement 587.00 595.00 0
2011-02-26 Remedial Casing Cementing 600.00 601.00 0
2011-02-26 Remedial Casing Cementing 483.00 484.00 0
2011-02-26 Packing Device Capped w/Cement 451.00 459.00 0
2011-02-26 Perforation 463.00 464.00 1
2011-02-26 Packing Device Capped w/Cement 472.00 480.00 0
2011-02-28 Cement Plug 268.90 286.00 0
2011-02-28 Remedial Casing Cementing 285.00 286.00 0
1997-01-15 Perforation 1935.50 1946.00 18
1997-01-18 Acid Treatment 1935.50 1946.00 0
1999-02-07 Perforation 1617.50 1620.00 18
1999-02-08 Fracture 1617.50 1620.00 0
2011-02-23 Packing Device Capped w/Cement 1992.00 2000.00 0
2011-02-24 Packing Device Capped w/Cement 1606.00 1614.00 0
2011-02-24 Packing Device Capped w/Cement 1922.00 1930.00 0

For data sources see[4]



References