X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635193512000

Well Details

Well ID: 0635193512000
Loading map...
Location: 00/12-35-063-19W5/0
Location Alias: 00/12-35-63-19 W5M
Location Alias 2: 00/12-35-063-19 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 12-35-63-19
Operator Name: Paramount Resources Ltd.
License Number: 0015818
License Date: 1958-08-28
License Status: Suspension
Spud Date: 1958-09-06
Final Drill Date: 1958-10-17
Well Total Depth: 3043.40 m
Surface Hole Latitude: 54.496116
Surface Hole Longitude: -116.770415

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-08-28 Obtained License
1958-10-17 Finished Drilling
1958-10-17 Well Mode changed to Drilled and Cased
1958-10-22 Production Casing Operation Performed
1958-10-24 Perforation Treatment Performed - Open-Hole Completion
1958-10-30 Well Began Production
1958-10-30 Well Fluid changed to Crude Oil
1958-10-30 Well Mode changed to Flowing
1970-07-28 Well Fluid changed to Crude Oil
1970-07-28 Well Mode changed to Suspended
1977-07-10 Well Fluid changed to Crude Oil
1977-07-10 Well Mode changed to Flowing
1977-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-01-01 Well Fluid changed to Crude Oil
1982-01-01 Well Mode changed to Suspended
1983-05-01 Well Began Injection
1983-05-01 Well Fluid changed to Water
1983-05-01 Well Type changed to Injection
1988-07-30 Well Fluid changed to Crude Oil
1988-07-30 Well Mode changed to Flowing
2001-02-07 Well Log Performed
2017-02-03 Well Fluid changed to Crude Oil
2017-02-03 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-10-24 Open Hole/Barefoot Completion 2985.50 3043.40 0
1977-11-22 Acid Treatment 2985.50 3043.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5295 0.0 0.0 0.0
1968 3266 0.0 0.0 0.0
1977 1826 0.0 0.0 0.0
1978 4043 0.0 0.0 0.0
1979 7183 0.0 0.0 0.0
1980 6858 0.0 0.0 0.0
1981 2984 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 3369 0.0 0.0 0.0
1989 6649 0.0 0.0 0.0
1990 8460 0.0 0.0 0.0
1991 8596 0.0 0.0 0.0
1992 7552 0.0 0.0 0.0
1993 7600 0.0 0.0 0.0
1994 8446 0.0 0.0 0.0
1995 8638 0.0 0.0 0.0
1996 8227 0.0 0.0 0.0
1997 8747 0.0 0.0 0.0
1998 8439 0.0 0.0 0.0
1999 8718 0.0 0.0 0.0
2000 8106 0.0 0.0 0.0
2001 7422 0.0 0.0 0.0
2002 6004 0.0 0.0 0.0
2003 7280 0.0 0.0 0.0
2004 5800 0.0 0.0 0.0
2005 2978 0.0 0.0 0.0
2006 7736 0.0 0.0 0.0
2007 3883 0.0 0.0 0.0
2008 6587 0.0 0.0 0.0
2009 5246 0.0 0.0 0.0
2010 8212 0.0 0.0 0.0
2011 8486 0.0 0.0 0.0
2012 8403 0.0 0.0 0.0
2013 3145 0.0 0.0 0.0

For data sources see[5]

References