X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635192708000

Well Details

Well ID: 0635192708000
Loading map...
Location: 00/08-27-063-19W5/0
Location Alias: 00/08-27-63-19 W5M
Location Alias 2: 00/08-27-063-19 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY BHLU 1 KAYBOB 8-27-63-19
Operator Name: Paramount Resources Ltd.
License Number: 0131682
License Date: 1988-01-26
License Status: Suspension
Spud Date: 1988-01-26
Final Drill Date: 1988-03-11
Well Total Depth: 3114.00 m
Surface Hole Latitude: 54.478485
Surface Hole Longitude: -116.776953

For data sources see[1][2]

Well History

Date Event
1988-01-26 Lost Circulation Occurred
1988-01-26 Obtained License
1988-01-30 Surface Casing Operation Performed
1988-02-09 Drill Stem Test Performed
1988-02-12 Drill Stem Test Performed
1988-02-25 Direction Drilling Operation Performed - Deviate
1988-03-06 Drill Stem Test Performed
1988-03-11 Finished Drilling
1988-03-11 Well Log Performed
1988-03-11 Well Mode changed to Drilled and Cased
1988-03-12 Well Log Performed
1988-03-13 Well Log Performed
1988-03-14 Well Log Performed
1988-03-16 Drill Stem Test Performed
1988-03-16 Well Log Performed
1988-03-19 Production Casing Operation Performed
1988-03-19 Rig Released
1988-07-21 Perforation Treatment Performed - Jet Perforation
1988-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-25 Well Began Production
1988-07-25 Well Fluid changed to Crude Oil
1988-07-25 Well Mode changed to Flowing
1989-08-08 Perforation Treatment Performed - Chemical Squeeze
1989-09-13 Well Log Performed
1991-01-30 Well Log Performed
1994-03-19 Well Fluid changed to Crude Oil
1994-03-19 Well Mode changed to Suspended
1996-11-05 Well Fluid changed to Crude Oil
1996-11-05 Well Mode changed to Flowing
2006-11-25 Well Fluid changed to Crude Oil
2006-11-25 Well Mode changed to Suspended
2016-02-28 Well Log Performed
2016-02-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-29 Plug Back Performed
2016-02-29 Well Fluid changed to Crude Oil
2016-02-29 Well Log Performed
2016-02-29 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-02-25 2750.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-07-21 Perforation 3004.50 3008.00 13
1988-07-21 Perforation 3009.50 3012.00 13
1988-07-21 Perforation 3014.00 3024.50 13
1988-07-21 Perforation 3026.50 3036.00 13
1988-07-21 Perforation 3038.00 3047.50 13
1988-07-21 Perforation 3051.00 3055.50 13
1988-07-24 Acid Treatment 3004.50 3055.50 0
1989-08-08 Chemical Squeeze 3004.50 3055.50 0
2016-02-29 Packing Device Capped w/Cement 2982.70 2990.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 2953 0.0 0.0 0.0
1989 6972 0.0 0.0 0.0
1990 6625 0.0 0.0 0.0
1991 8165 0.0 0.0 0.0
1992 5986 0.0 0.0 0.0
1993 3077 0.0 0.0 0.0
1994 1800 0.0 0.0 0.0
1996 1360 0.0 0.0 0.0
1997 8702 0.0 0.0 0.0
1998 4286 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-01-26 Lost Circulation 51.00 70.00
2016-03-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References