If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0635192110002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.46703,"lon":-116.807648,"icon":""}]} |
| Location: 00/10-21-063-19W5/2 | |
| Location Alias: 00/10-21-63-19 W5M | |
| Location Alias 2: 00/10-21-063-19 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 063 | |
| Meridian: 5 | |
| Range: 19 | |
| Section: 21 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TRILOGY KAYBOB 10-21-63-19 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0018222 | |
| License Date: 1959-12-01 | |
| License Status: Suspension | |
| Spud Date: 1959-12-04 | |
| Final Drill Date: 1960-01-16 | |
| Well Total Depth: 3092.20 m | |
| Surface Hole Latitude: 54.467030 | |
| Surface Hole Longitude: -116.807648 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1959-12-01 | Obtained License |
| 1960-01-16 | Finished Drilling |
| 1960-01-17 | Production Casing Operation Performed |
| 1960-01-22 | Perforation Treatment Performed - Jet Perforation |
| 1960-02-02 | Perforation Treatment Performed - Cement Squeeze |
| 1960-02-05 | Perforation Treatment Performed - Jet Perforation |
| 1960-02-06 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1960-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1960-02-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1960-02-14 | Perforation Treatment Performed - Fractured |
| 1960-02-14 | Perforation Treatment Performed - Jet Perforation |
| 1960-02-22 | Perforation Treatment Performed - Jet Perforation |
| 1960-03-03 | Well Mode changed to Drilled and Cased |
| 1962-12-22 | Well Began Production |
| 1962-12-22 | Well Fluid changed to Crude Oil |
| 1962-12-22 | Well Mode changed to Flowing |
| 1963-01-22 | Well Fluid changed to Crude Oil |
| 1963-01-22 | Well Mode changed to Suspended |
| 1963-06-06 | Well Fluid changed to Crude Oil |
| 1963-06-06 | Well Mode changed to Pumping |
| 1973-03-01 | Well Fluid changed to Crude Oil |
| 1973-03-01 | Well Mode changed to Suspended |
| 1978-09-12 | Perforation Treatment Performed - Cement Squeeze |
| 1978-09-12 | Well Fluid changed to Crude Oil |
| 1978-09-12 | Well Mode changed to Abandoned Zone |
| 1978-09-28 | Perforation Treatment Performed - Jet Perforation |
| 1978-09-29 | Perforation Treatment Performed - Jet Perforation |
| 1978-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1979-09-30 | Perforation Treatment Performed - Fractured |
| 1992-04-28 | Perforation Treatment Performed - Jet Perforation |
| 1992-04-28 | Well Log Performed |
| 1992-04-29 | Well Log Performed |
| 1992-05-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-01-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-01-06 | Well Log Performed |
| 2017-01-17 | Well Log Performed |
| 2017-01-18 | Perforation Treatment Performed - Jet Perforation |
| 2017-01-18 | Well Log Performed |
| 2017-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-01-19 | Perforation Treatment Performed - Remedial Casing |
| 2017-01-19 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1960-01-22 | Perforation | 1764.50 | 1764.80 | 13 |
| 1960-02-06 | Acid Wash | 1807.80 | 1810.80 | 0 |
| 1960-02-09 | Acid Treatment | 1807.80 | 1810.80 | 0 |
| 1960-02-10 | Acid Treatment | 1807.80 | 1810.80 | 0 |
| 1960-02-14 | Perforation | 1810.50 | 1817.50 | 13 |
| 1960-02-14 | Fracture | 1807.80 | 1817.50 | 0 |
| 1960-02-22 | Perforation | 3073.60 | 3076.70 | 13 |
| 1960-02-22 | Perforation | 3069.90 | 3071.80 | 13 |
| 1960-02-22 | Perforation | 3047.40 | 3048.60 | 13 |
| 1960-02-22 | Perforation | 3041.30 | 3045.00 | 13 |
| 1960-02-22 | Perforation | 3030.30 | 3037.00 | 13 |
| 1960-01-22 | Perforation | 1682.50 | 1682.80 | 13 |
| 1960-02-22 | Perforation | 3024.20 | 3028.50 | 13 |
| 1960-02-22 | Perforation | 3016.90 | 3021.80 | 13 |
| 1978-09-12 | Cement Squeeze | 1807.80 | 1817.50 | 0 |
| 1978-09-28 | Perforation | 3024.20 | 3028.50 | 7 |
| 1978-09-28 | Perforation | 3041.30 | 3046.20 | 7 |
| 1978-09-28 | Perforation | 3047.40 | 3050.40 | 7 |
| 1978-09-28 | Perforation | 3073.60 | 3076.70 | 7 |
| 1978-09-28 | Perforation | 3069.90 | 3071.80 | 7 |
| 1978-09-29 | Perforation | 3030.30 | 3037.00 | 7 |
| 1978-09-30 | Acid Treatment | 3016.90 | 3076.70 | 0 |
| 1960-01-22 | Perforation | 1546.50 | 1546.60 | 13 |
| 1979-09-30 | Fracture | 3016.90 | 3076.70 | 0 |
| 1992-04-28 | Perforation | 3006.00 | 3008.00 | 20 |
| 1992-05-02 | Acid Treatment | 3006.00 | 3008.00 | 0 |
| 2003-01-15 | Packing Device Capped w/Cement | 2988.00 | 2996.00 | 0 |
| 2017-01-18 | Perforation | 336.00 | 339.00 | 20 |
| 2017-01-19 | Remedial Casing Cementing | 336.00 | 339.00 | 0 |
| 2017-01-19 | Packing Device Capped w/Cement | 311.00 | 330.20 | 0 |
| 1960-01-22 | Perforation | 1511.50 | 1511.80 | 13 |
| 1960-02-02 | Cement Squeeze | 1764.50 | 1764.80 | 0 |
| 1960-02-02 | Cement Squeeze | 1682.50 | 1682.80 | 0 |
| 1960-02-02 | Cement Squeeze | 1546.50 | 1546.60 | 0 |
| 1960-02-02 | Cement Squeeze | 1511.50 | 1511.80 | 0 |
| 1960-02-05 | Perforation | 1807.80 | 1810.80 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 1144 | 0.0 | 0.0 | 0.0 |
| 1968 | 4129 | 0.0 | 0.0 | 0.0 |
| 1969 | 4079 | 0.0 | 0.0 | 0.0 |
| 1970 | 3449 | 0.0 | 0.0 | 0.0 |
| 1971 | 6855 | 0.0 | 0.0 | 0.0 |
| 1972 | 5328 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-01-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]