X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635192110000

Well Details

Well ID: 0635192110000
Loading map...
Location: 00/10-21-063-19W5/0
Location Alias: 00/10-21-63-19 W5M
Location Alias 2: 00/10-21-063-19 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 10-21-63-19
Operator Name: Paramount Resources Ltd.
License Number: 0018222
License Date: 1959-12-01
License Status: Suspension
Spud Date: 1959-12-04
Final Drill Date: 1960-01-16
Well Total Depth: 3092.20 m
Surface Hole Latitude: 54.467030
Surface Hole Longitude: -116.807648

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-12-01 Obtained License
1960-01-16 Finished Drilling
1960-01-16 Well Mode changed to Drilled and Cased
1960-01-17 Production Casing Operation Performed
1960-01-22 Perforation Treatment Performed - Jet Perforation
1960-02-02 Perforation Treatment Performed - Cement Squeeze
1960-02-05 Perforation Treatment Performed - Jet Perforation
1960-02-06 Perforation Treatment Performed - Acid Wash - No Pressure
1960-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-14 Perforation Treatment Performed - Fractured
1960-02-14 Perforation Treatment Performed - Jet Perforation
1960-02-22 Perforation Treatment Performed - Jet Perforation
1960-03-03 Well Began Production
1960-03-03 Well Fluid changed to Crude Oil
1960-03-03 Well Mode changed to Flowing
1978-09-12 Perforation Treatment Performed - Cement Squeeze
1978-09-12 Well Fluid changed to Crude Oil
1978-09-12 Well Mode changed to Flowing
1978-09-28 Perforation Treatment Performed - Jet Perforation
1978-09-29 Perforation Treatment Performed - Jet Perforation
1978-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-30 Perforation Treatment Performed - Fractured
1979-10-03 Well Fluid changed to Crude Oil
1979-10-03 Well Mode changed to Pumping
1992-04-28 Perforation Treatment Performed - Jet Perforation
1992-04-28 Well Log Performed
1992-04-29 Well Log Performed
1992-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-04 Well Fluid changed to Crude Oil
1992-09-04 Well Mode changed to Suspended
2002-02-14 Well Fluid changed to Crude Oil
2002-02-14 Well Mode changed to Pumping
2003-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-15 Well Fluid changed to Crude Oil
2003-01-15 Well Mode changed to Suspended
2017-01-06 Well Log Performed
2017-01-17 Well Log Performed
2017-01-18 Perforation Treatment Performed - Jet Perforation
2017-01-18 Well Log Performed
2017-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-01-19 Perforation Treatment Performed - Remedial Casing
2017-01-19 Plug Back Performed
2017-01-19 Well Fluid changed to Crude Oil
2017-01-19 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-01-22 Perforation 1764.50 1764.80 13
1960-02-06 Acid Wash 1807.80 1810.80 0
1960-02-09 Acid Treatment 1807.80 1810.80 0
1960-02-10 Acid Treatment 1807.80 1810.80 0
1960-02-14 Perforation 1810.50 1817.50 13
1960-02-14 Fracture 1807.80 1817.50 0
1960-02-22 Perforation 3073.60 3076.70 13
1960-02-22 Perforation 3069.90 3071.80 13
1960-02-22 Perforation 3047.40 3048.60 13
1960-02-22 Perforation 3041.30 3045.00 13
1960-02-22 Perforation 3030.30 3037.00 13
1960-01-22 Perforation 1682.50 1682.80 13
1960-02-22 Perforation 3024.20 3028.50 13
1960-02-22 Perforation 3016.90 3021.80 13
1978-09-12 Cement Squeeze 1807.80 1817.50 0
1978-09-28 Perforation 3024.20 3028.50 7
1978-09-28 Perforation 3041.30 3046.20 7
1978-09-28 Perforation 3047.40 3050.40 7
1978-09-28 Perforation 3073.60 3076.70 7
1978-09-28 Perforation 3069.90 3071.80 7
1978-09-29 Perforation 3030.30 3037.00 7
1978-09-30 Acid Treatment 3016.90 3076.70 0
1960-01-22 Perforation 1546.50 1546.60 13
1979-09-30 Fracture 3016.90 3076.70 0
1992-04-28 Perforation 3006.00 3008.00 20
1992-05-02 Acid Treatment 3006.00 3008.00 0
2003-01-15 Packing Device Capped w/Cement 2988.00 2996.00 0
2017-01-18 Perforation 336.00 339.00 20
2017-01-19 Remedial Casing Cementing 336.00 339.00 0
2017-01-19 Packing Device Capped w/Cement 311.00 330.20 0
1960-01-22 Perforation 1511.50 1511.80 13
1960-02-02 Cement Squeeze 1764.50 1764.80 0
1960-02-02 Cement Squeeze 1682.50 1682.80 0
1960-02-02 Cement Squeeze 1546.50 1546.60 0
1960-02-02 Cement Squeeze 1511.50 1511.80 0
1960-02-05 Perforation 1807.80 1810.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7645 0.0 0.0 0.0
1968 7848 0.0 0.0 0.0
1969 5274 0.0 0.0 0.0
1970 456 0.0 0.0 0.0
1971 2646 0.0 0.0 0.0
1974 1586 0.0 0.0 0.0
1976 5563 0.0 0.0 0.0
1977 2898 0.0 0.0 0.0
1978 1794 0.0 0.0 0.0
1979 676 0.0 0.0 0.0
1980 5947 0.0 0.0 0.0
1981 3690 0.0 0.0 0.0
1982 6947 0.0 0.0 0.0
1983 6107 0.0 0.0 0.0
1984 5571 0.0 0.0 0.0
1985 8140 0.0 0.0 0.0
1986 8472 0.0 0.0 0.0
1987 8471 0.0 0.0 0.0
1988 7479 0.0 0.0 0.0
1989 8215 0.0 0.0 0.0
1990 8495 0.0 0.0 0.0
1991 8682 0.0 0.0 0.0
1992 4114 0.0 0.0 0.0
2002 2745 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References