X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635192010002

Well Details

Well ID: 0635192010002
Loading map...
Location: 00/10-20-063-19W5/2
Location Alias: 00/10-20-63-19 W5M
Location Alias 2: 00/10-20-063-19 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 10-20-63-19
Operator Name: Paramount Resources Ltd.
License Number: 0023794
License Date: 1963-02-13
License Status: Issued
Spud Date: 1963-02-18
Final Drill Date: 1963-06-08
Well Total Depth: 3189.70 m
Surface Hole Latitude: 54.470135
Surface Hole Longitude: -116.826505

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-02-13 Obtained License
1963-02-18 Direction Drilling Operation Performed - 98
1963-03-16 Drill Stem Test Performed
1963-03-25 Drill Stem Test Performed
1963-06-08 Finished Drilling
1963-06-08 Well Mode changed to Drilled and Cased
1963-06-13 Production Casing Operation Performed
1970-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-06-19 Perforation Treatment Performed - Jet Perforation
1970-06-19 Well Log Performed
2005-02-27 Perforation Treatment Performed - Cement Squeeze
2005-02-27 Plug Back Performed
2005-03-01 Well Fluid changed to Gas
2005-03-01 Well Mode changed to Testing
2005-03-03 Well Log Performed
2005-03-05 Perforation Treatment Performed - Jet Perforation
2005-03-05 Well Log Performed
2005-03-07 Perforation Treatment Performed - Fractured
2005-04-18 Well Began Production
2005-04-18 Well Fluid changed to Gas
2005-04-18 Well Mode changed to Flowing
2014-03-29 Well Fluid changed to Gas
2014-03-29 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1963-02-18 1067.10 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-06-19 Perforation 1541.70 1545.90 7
1970-06-19 Acid Treatment 1541.70 1545.90 0
2005-02-27 Cement Squeeze 1541.70 1545.90 0
2005-03-05 Perforation 1823.00 1829.20 20
2005-03-07 Fracture 1823.00 1829.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 6087 0.0 0.0 0.0
2006 8174 0.0 0.0 0.0
2007 8735 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8519 0.0 0.0 0.0
2010 8687 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8151 0.0 0.0 0.0
2014 8599 0.0 0.0 0.0
2015 7135 0.0 0.0 0.0
2016 8521 0.0 0.0 0.0
2017 7800 0.0 0.0 0.0
2018 7864 0.0 0.0 0.0
2019 4745 0.0 0.0 0.0
2020 1631 0.0 0.0 0.0

For data sources see[6]

References