X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635191906000

Well Details

Well ID: 0635191906000
Loading map...
Location: 00/06-19-063-19W5/0
Location Alias: 00/06-19-63-19 W5M
Location Alias 2: 00/06-19-063-19 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 6-19-63-19
Operator Name: Paramount Resources Ltd.
License Number: 0199497
License Date: 1997-03-19
License Status: Issued
Spud Date: 1997-03-30
Final Drill Date: 1997-04-10
Well Total Depth: 1931.00 m
Surface Hole Latitude: 54.467281
Surface Hole Longitude: -116.869170

For data sources see[1][2]

Well History

Date Event
1997-03-19 Obtained License
1997-03-31 Surface Casing Operation Performed
1997-04-03 Direction Drilling Operation Performed - Deviate
1997-04-10 Finished Drilling
1997-04-10 Well Mode changed to Drilled and Cased
1997-04-11 Well Log Performed
1997-04-12 Production Casing Operation Performed
1997-04-12 Rig Released
1997-04-14 Well Log Performed
1997-04-30 Perforation Treatment Performed - Jet Perforation
1997-04-30 Well Log Performed
1997-05-01 Perforation Treatment Performed - Fractured
1997-05-16 Well Began Production
1997-05-16 Well Fluid changed to Crude Oil
1997-05-16 Well Mode changed to Pumping
1999-03-08 Well Log Performed
1999-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-09 Perforation Treatment Performed - Jet Perforation
1999-03-09 Plug Back Performed
1999-03-09 Well Fluid changed to Crude Oil
1999-03-09 Well Mode changed to Abandoned Zone
1999-03-11 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-04-03 1080.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-04-30 Perforation 1900.50 1913.50 13
1997-05-01 Fracture 1900.50 1913.50 0
1999-03-09 Packing Device Capped w/Cement 1877.50 1885.70 0
1999-03-09 Perforation 1560.50 1562.70 17
1999-03-11 Fracture 1560.50 1562.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4101 0.0 0.0 0.0
1998 8117 0.0 0.0 0.0
1999 19 0.0 0.0 0.0

For data sources see[6]

References