X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635191616002

Well Details

Well ID: 0635191616002
Loading map...
Location: 00/16-16-063-19W5/2
Location Alias: 00/16-16-63-19 W5M
Location Alias 2: 00/16-16-063-19 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY ET AL KAYBOB 16-16-63-19
Operator Name: Paramount Resources Ltd.
License Number: 0148417
License Date: 1991-03-15
License Status: Issued
Spud Date: 1991-03-21
Final Drill Date: 1991-04-21
Well Total Depth: 3125.00 m
Surface Hole Latitude: 54.457130
Surface Hole Longitude: -116.797079

For data sources see[1][2]

Well History

Date Event
1991-03-15 Obtained License
1991-03-22 Surface Casing Operation Performed
1991-03-24 Direction Drilling Operation Performed - Deviate
1991-04-21 Finished Drilling
1991-04-21 Well Mode changed to Drilled and Cased
1991-04-22 Well Log Performed
1991-04-25 Well Log Performed
1991-04-26 Production Casing Operation Performed
1991-04-27 Rig Released
1991-07-26 Perforation Treatment Performed - Jet Perforation
2001-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-06 Plug Back Performed
2001-12-06 Well Log Performed
2001-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-07 Plug Back Performed
2008-05-27 Well Log Performed
2008-05-28 Perforation Treatment Performed - Jet Perforation
2008-05-29 Perforation Treatment Performed - Fractured
2008-06-01 Well Began Production
2008-06-01 Well Fluid changed to Crude Oil
2008-06-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-03-24 674.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-07-26 Perforation 3044.00 3048.00 13
2001-12-06 Packing Device Capped w/Cement 3028.00 3032.00 0
2001-12-07 Packing Device Capped w/Cement 3020.00 3024.00 0
2008-05-28 Perforation 1837.50 1843.50 20
2008-05-29 Fracture 1837.50 1843.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2487 0.0 0.0 0.0
2009 8387 0.0 0.0 0.0
2010 8485 0.0 0.0 0.0
2011 8641 0.0 0.0 0.0
2012 8720 0.0 0.0 0.0
2013 7845 0.0 0.0 0.0
2014 5345 0.0 0.0 0.0
2015 8210 0.0 0.0 0.0
2016 8155 0.0 0.0 0.0
2017 8486 0.0 0.0 0.0
2018 6820 0.0 0.0 0.0
2019 8646 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References