X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635191013020

Well Details

Well ID: 0635191013020
Loading map...
Location: 02/13-10-063-19W5/0
Location Alias: 02/13-10-63-19 W5M
Location Alias 2: 02/13-10-063-19 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 19
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ 102 FOXCK 13-10-63-19
Operator Name: Paramount Resources Ltd.
License Number: 0439184
License Date: 2011-11-18
License Status: Suspension
Spud Date: 2011-11-22
Final Drill Date: 2011-12-06
Well Total Depth: 3621.00 m
Surface Hole Latitude: 54.444768
Surface Hole Longitude: -116.767921

For data sources see[1][2]

Well History

Date Event
2011-11-18 Obtained License
2011-11-25 Surface Casing Operation Performed
2011-11-29 Direction Drilling Operation Performed - Horizontal
2011-12-01 Intermediate Casing Operation Performed
2011-12-06 Finished Drilling
2011-12-06 Well Log Performed
2011-12-06 Well Mode changed to Drilled and Cased
2011-12-08 Liner Casing Operation Performed
2011-12-09 Rig Released
2011-12-15 Well Log Performed
2011-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-19 Perforation Treatment Performed - Open-Hole Completion
2012-01-21 Well Log Performed
2012-05-26 Well Began Production
2012-05-26 Well Fluid changed to Crude Oil
2012-05-26 Well Mode changed to Pumping
2013-11-27 Well Fluid changed to Crude Oil
2013-11-27 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-29 2086.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-19 Open Hole/Barefoot Completion 3615.00 3621.00 0
2011-12-19 Multi-Stage Fracture 3025.20 3076.80 0
2011-12-19 Multi-Stage Fracture 2961.70 3025.10 0
2011-12-19 Multi-Stage Fracture 2886.50 2961.60 0
2011-12-19 Multi-Stage Fracture 2811.40 2886.40 0
2011-12-19 Multi-Stage Fracture 2736.30 2811.30 0
2011-12-19 Multi-Stage Fracture 2656.20 2736.20 0
2011-12-19 Multi-Stage Fracture 2586.10 2656.10 0
2011-12-19 Multi-Stage Fracture 2515.60 2586.00 0
2011-12-19 Multi-Stage Fracture 2435.80 2515.50 0
2011-12-19 Multi-Stage Fracture 2367.80 2435.70 0
2011-12-19 Multi-Stage Fracture 3605.70 3621.00 0
2011-12-19 Multi-Stage Fracture 2297.00 2367.70 0
2011-12-19 Multi-Stage Fracture 2220.30 2296.90 0
2011-12-19 Multi-Stage Fracture 2157.20 2220.20 0
2011-12-19 Multi-Stage Fracture 3546.80 3605.60 0
2011-12-19 Multi-Stage Fracture 3478.40 3546.70 0
2011-12-19 Multi-Stage Fracture 3394.10 3478.30 0
2011-12-19 Multi-Stage Fracture 3320.20 3394.00 0
2011-12-19 Multi-Stage Fracture 3245.60 3320.10 0
2011-12-19 Multi-Stage Fracture 3180.30 3245.50 0
2011-12-19 Multi-Stage Fracture 3076.90 3180.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1231 0.0 0.0 0.0

For data sources see[6]

References