X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635181113000

Well Details

Well ID: 0635181113000
Loading map...
Location: 00/13-11-063-18W5/0
Location Alias: 00/13-11-63-18 W5M
Location Alias 2: 00/13-11-063-18 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 18
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 13-11-63-18
Operator Name: Paramount Resources Ltd.
License Number: 0172414
License Date: 1994-11-14
License Status: Suspension
Spud Date: 1994-12-28
Final Drill Date: 1995-01-05
Well Total Depth: 1815.00 m
Surface Hole Latitude: 54.440172
Surface Hole Longitude: -116.616721

For data sources see[1][2]

Well History

Date Event
1994-11-14 Obtained License
1994-12-30 Surface Casing Operation Performed
1995-01-05 Finished Drilling
1995-01-05 Well Log Performed
1995-01-05 Well Mode changed to Drilled and Cased
1995-01-06 Drill Stem Test Performed
1995-01-08 Production Casing Operation Performed
1995-01-08 Rig Released
1995-01-17 Well Log Performed
1995-01-18 Perforation Treatment Performed - Jet Perforation
1995-01-18 Well Log Performed
1995-07-24 Well Began Production
1995-07-24 Well Fluid changed to Gas
1995-07-24 Well Mode changed to Flowing
2007-11-17 Well Fluid changed to Gas
2007-11-17 Well Mode changed to Suspended
2011-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-20 Plug Back Performed
2011-02-20 Well Fluid changed to Gas
2011-02-20 Well Log Performed
2011-02-20 Well Mode changed to Abandoned Zone
2011-02-21 Well Log Performed
2011-02-23 Well Log Performed
2011-02-24 Well Log Performed
2011-02-25 Perforation Treatment Performed - Jet Perforation
2011-02-27 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-18 Perforation 1512.00 1514.50 13
1995-01-18 Perforation 1515.50 1517.00 13
2011-02-20 Packing Device Capped w/Cement 1496.80 1504.90 0
2011-02-25 Perforation 310.00 312.00 17
2011-02-27 Remedial Casing Cementing 310.00 312.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 2204 0.0 0.0 0.0
1996 5407 0.0 0.0 0.0
1997 2843 0.0 0.0 0.0
1998 8374 0.0 0.0 0.0
1999 8404 0.0 0.0 0.0
2000 2805 0.0 0.0 0.0
2001 41 0.0 0.0 0.0

For data sources see[5]

References