If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635161202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.431877,"lon":-116.27909,"icon":""}]} |
Location: 00/02-12-063-16W5/0 | |
Location Alias: 00/02-12-63-16 W5M | |
Location Alias 2: 00/02-12-063-16 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 16 | |
Section: 12 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: SUMMIT TWO CREEK 2-12-63-16 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0169938 | |
License Date: 1994-08-26 | |
License Status: RecCertified | |
Spud Date: 1994-10-21 | |
Final Drill Date: 1994-10-27 | |
Well Total Depth: 1720.00 m | |
Surface Hole Latitude: 54.431877 | |
Surface Hole Longitude: -116.279090 |
Date | Event |
---|---|
1994-08-26 | Obtained License |
1994-10-21 | Well Log Performed |
1994-10-22 | Surface Casing Operation Performed |
1994-10-27 | Finished Drilling |
1994-10-28 | Drill Stem Test Performed |
1994-10-28 | Well Log Performed |
1994-10-30 | Production Casing Operation Performed |
1994-10-30 | Rig Released |
1994-11-06 | Well Log Performed |
1994-11-07 | Perforation Treatment Performed - Jet Perforation |
1994-11-07 | Well Log Performed |
1994-11-09 | Perforation Treatment Performed - Fractured |
1994-11-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-11-12 | Plug Back Performed |
1994-11-13 | Perforation Treatment Performed - Jet Perforation |
1994-11-26 | Well Mode changed to Drilled and Cased |
1995-05-16 | Well Began Production |
1995-05-16 | Well Fluid changed to Crude Oil |
1995-05-16 | Well Mode changed to Pumping |
1995-07-10 | Well Fluid changed to Crude Oil |
1995-07-10 | Well Mode changed to Suspended |
1997-12-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-12-16 | Perforation Treatment Performed - Jet Perforation |
1997-12-16 | Plug Back Performed |
1997-12-16 | Well Log Performed |
1997-12-18 | Well Abandoned |
1997-12-18 | Well Fluid changed to Crude Oil |
1997-12-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-11-07 | Perforation | 1680.00 | 1682.00 | 17 |
1994-11-09 | Fracture | 1680.00 | 1682.00 | 0 |
1994-11-12 | Packing Device Capped w/Cement | 1667.00 | 1675.00 | 0 |
1994-11-13 | Perforation | 1651.00 | 1653.00 | 18 |
1997-12-16 | Packing Device Capped w/Cement | 1640.00 | 1648.00 | 0 |
1997-12-16 | Perforation | 394.00 | 395.00 | 13 |
1997-12-16 | Packing Device Capped w/Cement | 341.70 | 410.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 1230 | 0.0 | 0.0 | 0.0 |
For data sources see[5]