If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635133304000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.488737,"lon":-115.913431,"icon":""}]} |
Location: 00/04-33-063-13W5/0 | |
Location Alias: 00/04-33-63-13 W5M | |
Location Alias 2: 00/04-33-063-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 13 | |
Section: 33 | |
County/Municipality: Woodlands County | |
Well Name: ACL HOPE CREEK 4-33-63-13 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0022095 | |
License Date: 1962-02-13 | |
License Status: Suspension | |
Spud Date: 1962-02-14 | |
Final Drill Date: 1962-03-15 | |
Well Total Depth: 2929.40 m | |
Surface Hole Latitude: 54.488737 | |
Surface Hole Longitude: -115.913431 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-02-13 | Obtained License |
1962-02-14 | Lost Circulation Occurred |
1962-03-01 | Lost Circulation Occurred |
1962-03-15 | Finished Drilling |
1962-03-17 | Drill Stem Test Performed |
1962-03-19 | Drill Stem Test Performed |
1962-03-20 | Production Casing Operation Performed |
1962-03-21 | Well Mode changed to Drilled and Cased |
1976-03-26 | Perforation Treatment Performed - Jet Perforation |
1976-03-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-03-30 | Perforation Treatment Performed - Jet Perforation |
1976-03-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-11-02 | Well Began Production |
1978-11-02 | Well Fluid changed to Gas |
1978-11-02 | Well Mode changed to Flowing |
1982-07-20 | Well Fluid changed to Gas |
1982-07-20 | Well Mode changed to Suspended |
1993-07-08 | Well Log Performed |
1993-07-12 | Well Log Performed |
1993-07-15 | Well Began Injection |
1993-07-15 | Well Fluid changed to Gas |
1993-07-15 | Well Type changed to Injection |
2011-09-01 | Well Fluid changed to Gas |
2011-09-01 | Well Mode changed to Suspended |
2011-09-01 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-03-26 | Perforation | 1918.70 | 1919.60 | 10 |
1976-03-27 | Acid Treatment | 1918.70 | 1919.60 | 0 |
1976-03-30 | Perforation | 1912.90 | 1918.70 | 7 |
1976-03-31 | Acid Treatment | 1912.90 | 1919.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 711 | 0.0 | 0.0 | 0.0 |
1980 | 1387 | 0.0 | 0.0 | 0.0 |
1981 | 5 | 0.0 | 0.0 | 0.0 |
1983 | 49 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1962-02-14 | Lost Circulation | 91.40 | 91.40 |
1962-03-01 | Lost Circulation | 1915.60 | 1915.60 |
For data sources see[6]