X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635133304000

Well Details

Well ID: 0635133304000
Loading map...
Location: 00/04-33-063-13W5/0
Location Alias: 00/04-33-63-13 W5M
Location Alias 2: 00/04-33-063-13 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 13
Section: 33
County/Municipality: Woodlands County
Well Name: ACL HOPE CREEK 4-33-63-13
Operator Name: Paramount Resources Ltd.
License Number: 0022095
License Date: 1962-02-13
License Status: Suspension
Spud Date: 1962-02-14
Final Drill Date: 1962-03-15
Well Total Depth: 2929.40 m
Surface Hole Latitude: 54.488737
Surface Hole Longitude: -115.913431

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-02-13 Obtained License
1962-02-14 Lost Circulation Occurred
1962-03-01 Lost Circulation Occurred
1962-03-15 Finished Drilling
1962-03-17 Drill Stem Test Performed
1962-03-19 Drill Stem Test Performed
1962-03-20 Production Casing Operation Performed
1962-03-21 Well Mode changed to Drilled and Cased
1976-03-26 Perforation Treatment Performed - Jet Perforation
1976-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-30 Perforation Treatment Performed - Jet Perforation
1976-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-02 Well Began Production
1978-11-02 Well Fluid changed to Gas
1978-11-02 Well Mode changed to Flowing
1982-07-20 Well Fluid changed to Gas
1982-07-20 Well Mode changed to Suspended
1993-07-08 Well Log Performed
1993-07-12 Well Log Performed
1993-07-15 Well Began Injection
1993-07-15 Well Fluid changed to Gas
1993-07-15 Well Type changed to Injection
2011-09-01 Well Fluid changed to Gas
2011-09-01 Well Mode changed to Suspended
2011-09-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-26 Perforation 1918.70 1919.60 10
1976-03-27 Acid Treatment 1918.70 1919.60 0
1976-03-30 Perforation 1912.90 1918.70 7
1976-03-31 Acid Treatment 1912.90 1919.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 711 0.0 0.0 0.0
1980 1387 0.0 0.0 0.0
1981 5 0.0 0.0 0.0
1983 49 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1962-02-14 Lost Circulation 91.40 91.40
1962-03-01 Lost Circulation 1915.60 1915.60

For data sources see[6]

References