If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635133009022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.485297,"lon":-115.937686,"icon":""}]} |
Location: 02/09-30-063-13W5/2 | |
Location Alias: 02/09-30-63-13 W5M | |
Location Alias 2: 02/09-30-063-13 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 13 | |
Section: 30 | |
County/Municipality: Woodlands County | |
Well Name: ACL ET AL VIRGHILLS 9-30-63-13 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0080539 | |
License Date: 1980-01-21 | |
License Status: Abandoned | |
Spud Date: 1980-05-10 | |
Final Drill Date: 1994-02-17 | |
Well Total Depth: 2543.00 m | |
Surface Hole Latitude: 54.485297 | |
Surface Hole Longitude: -115.937686 |
Date | Event |
---|---|
1980-01-21 | Obtained License |
1994-01-31 | Well Log Performed |
1994-02-01 | Direction Drilling Operation Performed - Horizontal |
1994-02-02 | Well Log Performed |
1994-02-17 | Finished Drilling |
1994-02-17 | Well Mode changed to Drilled and Cased |
1994-02-18 | Well Log Performed |
1994-02-24 | Liner Casing Operation Performed |
1994-02-24 | Perforation Treatment Performed - Open-Hole Completion |
1994-02-24 | Perforation Treatment Performed - Slotted Liner or Casing |
1994-02-26 | Rig Released |
1994-04-01 | Well Began Production |
1994-04-01 | Well Fluid changed to Crude Oil |
1994-04-01 | Well Mode changed to Flowing |
1994-11-22 | Well Fluid changed to Crude Oil |
1994-11-22 | Well Mode changed to Suspended |
2010-04-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-04-09 | Perforation Treatment Performed - Jet Perforation |
2010-04-09 | Plug Back Performed |
2010-04-09 | Well Fluid changed to Crude Oil |
2010-04-09 | Well Mode changed to Abandoned Zone |
2010-04-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-04-10 | Perforation Treatment Performed - Remedial Casing |
2010-04-12 | Perforation Treatment Performed - Jet Perforation |
2010-04-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-04-13 | Perforation Treatment Performed - Remedial Casing |
2010-04-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-04-14 | Perforation Treatment Performed - Jet Perforation |
2010-04-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-04-15 | Perforation Treatment Performed - Jet Perforation |
2010-04-16 | Perforation Treatment Performed - Jet Perforation |
2010-04-17 | Perforation Treatment Performed - Cement Plug |
2010-04-20 | Perforation Treatment Performed - Cement Plug |
2010-04-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-04-21 | Perforation Treatment Performed - Remedial Casing |
2010-04-22 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-02-01 | 1759.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-02-24 | Slotted Liner | 1753.90 | 2526.10 | 0 |
2010-04-14 | Perforation | 698.70 | 699.70 | 18 |
2010-04-14 | Acid Treatment | 698.70 | 699.70 | 0 |
2010-04-15 | Packing Device Capped w/Cement | 686.70 | 696.70 | 0 |
2010-04-15 | Perforation | 601.90 | 602.90 | 20 |
2010-04-16 | Perforation | 204.00 | 205.00 | 20 |
2010-04-16 | Perforation | 259.00 | 260.00 | 20 |
2010-04-16 | Perforation | 325.00 | 326.00 | 20 |
2010-04-16 | Perforation | 420.00 | 421.00 | 20 |
2010-04-16 | Perforation | 474.00 | 475.00 | 20 |
2010-04-16 | Perforation | 552.00 | 553.00 | 20 |
1994-02-24 | Open Hole/Barefoot Completion | 2526.10 | 2543.00 | 0 |
2010-04-17 | Cement Plug | 299.00 | 620.00 | 0 |
2010-04-20 | Cement Plug | 230.30 | 299.00 | 0 |
2010-04-21 | Remedial Casing Cementing | 204.00 | 205.00 | 0 |
2010-04-21 | Packing Device Capped w/Cement | 188.00 | 200.00 | 0 |
2010-04-09 | Packing Device Capped w/Cement | 1710.00 | 1730.00 | 0 |
2010-04-09 | Perforation | 1725.00 | 1726.00 | 18 |
2010-04-10 | Remedial Casing Cementing | 1725.00 | 1726.00 | 0 |
2010-04-10 | Packing Device Capped w/Cement | 1698.00 | 1710.00 | 0 |
2010-04-12 | Perforation | 1315.00 | 1316.00 | 18 |
2010-04-13 | Remedial Casing Cementing | 1315.00 | 1316.00 | 0 |
2010-04-13 | Packing Device Capped w/Cement | 1298.00 | 1313.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 2696 | 0.0 | 0.0 | 0.0 |
For data sources see[6]