X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635121310000

Well Details

Well ID: 0635121310000
Loading map...
Location: 00/10-13-063-12W5/0
Location Alias: 00/10-13-63-12 W5M
Location Alias 2: 00/10-13-063-12 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 12
Section: 13
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 10-13-63-12
Operator Name: ACCEL Energy Canada Limited
License Number: 0017439
License Date: 1959-07-17
License Status: Amended
Spud Date: 1959-08-03
Final Drill Date: 1959-09-14
Well Total Depth: 2799.60 m
Surface Hole Latitude: 54.452365
Surface Hole Longitude: -115.674174

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-07-17 Obtained License
1959-09-07 Drill Stem Test Performed
1959-09-14 Finished Drilling
1959-09-14 Well Mode changed to Drilled and Cased
1959-09-16 Production Casing Operation Performed
1959-09-18 Perforation Treatment Performed - Bullet Perforation
1959-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-20 Perforation Treatment Performed - Cement Squeeze
1959-09-22 Perforation Treatment Performed - Jet Perforation
1959-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-24 Perforation Treatment Performed - Cement Squeeze
1959-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-26 Perforation Treatment Performed - Jet Perforation
1959-10-01 Well Began Production
1959-10-01 Well Fluid changed to Crude Oil
1959-10-01 Well Mode changed to Flowing
1974-07-13 Well Fluid changed to Crude Oil
1974-07-13 Well Mode changed to Pumping
1981-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-01 Well Fluid changed to Crude Oil
1982-05-01 Well Mode changed to Suspended
1998-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-05 Perforation Treatment Performed - Jet Perforation
1998-09-05 Plug Back Performed
1998-09-05 Well Fluid changed to Crude Oil
1998-09-05 Well Log Performed
1998-09-05 Well Mode changed to Abandoned Zone
1998-09-10 Perforation Treatment Performed - Remedial Casing
1998-09-14 Well Abandoned
1998-09-14 Well Fluid changed to Crude Oil
1998-09-14 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-09-18 Bullet Perforation 2692.00 2695.70 13
1959-09-26 Perforation 2665.80 2667.60 13
1959-09-26 Perforation 2667.90 2668.50 13
1959-09-26 Perforation 2670.70 2672.80 13
1959-09-26 Perforation 2673.40 2675.80 13
1959-09-26 Perforation 2676.80 2677.40 13
1959-09-26 Perforation 2678.00 2678.90 13
1959-09-26 Acid Treatment 2658.20 2678.90 0
1981-04-02 Acid Treatment 2658.20 2678.90 0
1998-09-05 Packing Device Capped w/Cement 2636.00 2644.00 0
1998-09-05 Perforation 370.00 371.00 13
1959-09-19 Acid Treatment 2692.00 2695.70 0
1998-09-10 Remedial Casing Cementing 370.00 371.00 0
1959-09-20 Cement Squeeze 2692.00 2695.70 0
1959-09-22 Perforation 2682.50 2684.10 13
1959-09-22 Perforation 2685.30 2687.10 13
1959-09-23 Acid Treatment 2682.50 2687.10 0
1959-09-24 Cement Squeeze 2682.50 2687.10 0
1959-09-26 Perforation 2658.20 2659.40 0
1959-09-26 Perforation 2660.00 2662.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4968 0.0 0.0 0.0
1971 626 0.0 0.0 0.0
1972 1802 0.0 0.0 0.0
1973 1538 0.0 0.0 0.0
1974 3006 0.0 0.0 0.0
1975 7010 0.0 0.0 0.0
1976 8531 0.0 0.0 0.0
1977 5558 0.0 0.0 0.0
1978 4724 0.0 0.0 0.0
1980 5701 0.0 0.0 0.0
1981 4002 0.0 0.0 0.0
1982 420 0.0 0.0 0.0

For data sources see[5]

References