0635113202000

Well Details

Well ID: 0635113202000
Loading map...
Location: 00/02-32-063-11W5/0
Location Alias: 00/02-32-63-11 W5M
Location Alias 2: 00/02-32-063-11 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 11
Section: 32
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 2-32-63-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0021698
License Date: 1961-11-16
License Status: Abandoned
Spud Date: 1961-11-20
Final Drill Date: 1961-12-19
Well Total Depth: 2770.60 m
Surface Hole Latitude: 54.488687
Surface Hole Longitude: -115.624458

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-11-16 Obtained License
1961-12-19 Finished Drilling
1961-12-19 Well Mode changed to Drilled and Cased
1961-12-21 Production Casing Operation Performed
1962-01-01 Perforation Treatment Performed - Jet Perforation
1962-01-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-04 Well Began Production
1962-01-04 Well Fluid changed to Crude Oil
1962-01-04 Well Mode changed to Flowing
1973-05-23 Perforation Treatment Performed - Jet Perforation
1973-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-11-16 Well Fluid changed to Crude Oil
1973-11-16 Well Mode changed to Pumping
1977-02-18 Perforation Treatment Performed - Cement Squeeze
1977-02-22 Perforation Treatment Performed - Cement Squeeze
1977-02-27 Perforation Treatment Performed - Jet Perforation
1977-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-07-01 Well Fluid changed to Crude Oil
1983-07-01 Well Mode changed to Suspended
1987-05-09 Perforation Treatment Performed - Jet Perforation
1987-05-09 Well Log Performed
1987-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-12 Well Log Performed
1987-09-04 Well Began Injection
1987-09-04 Well Fluid changed to Water
1987-09-04 Well Type changed to Injection
1987-11-25 Well Log Performed
1989-01-07 Well Log Performed
1989-01-08 Well Log Performed
1989-01-15 Perforation Treatment Performed - Jet Perforation
1989-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-11 Well Fluid changed to Solvent
1990-01-11 Well Type changed to Injection
1990-02-08 Well Log Performed
1990-03-30 Perforation Treatment Performed - Chemical Squeeze
1990-04-02 Well Log Performed
1990-04-21 Well Log Performed
1993-12-01 Well Fluid changed to Solvent
1993-12-01 Well Mode changed to Suspended
1993-12-01 Well Type changed to Injection
2005-04-16 Perforation Treatment Performed - Cement Plug
2005-04-16 Plug Back Performed
2005-04-16 Well Fluid changed to Solvent
2005-04-16 Well Mode changed to Abandoned Zone
2005-04-16 Well Type changed to Injection
2005-04-20 Perforation Treatment Performed - Jet Perforation
2005-04-21 Perforation Treatment Performed - Cement Plug
2005-04-21 Plug Back Performed
2005-05-09 Well Abandoned
2005-05-09 Well Fluid changed to Solvent
2005-05-09 Well Mode changed to Abandoned
2005-05-09 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-01-01 Perforation 2728.90 2733.40 13
1977-02-27 Perforation 2746.90 2748.70 3
1977-02-27 Perforation 2753.90 2755.40 3
1977-03-01 Acid Treatment 2718.50 2755.40 0
1977-03-04 Acid Treatment 2718.50 2755.40 0
1987-05-09 Perforation 2706.70 2710.90 7
1987-05-09 Perforation 2714.60 2718.80 7
1987-05-09 Perforation 2720.70 2723.10 7
1987-05-09 Perforation 2731.00 2735.30 7
1987-05-11 Acid Treatment 2706.70 2735.30 0
1989-01-15 Perforation 2710.90 2714.50 7
1962-01-02 Acid Treatment 2728.90 2733.40 0
1989-01-15 Perforation 2728.90 2731.00 7
1989-01-15 Perforation 2745.60 2750.80 7
1989-01-20 Acid Treatment 2710.90 2755.40 0
1990-03-30 Chemical Squeeze 2706.00 2723.10 0
2005-04-16 Cement Plug 2226.80 2755.40 0
2005-04-20 Perforation 600.00 601.00 20
2005-04-21 Cement Plug 534.60 616.40 0
1973-05-23 Perforation 2706.60 2710.30 3
1973-05-23 Perforation 2712.10 2718.20 3
1973-05-24 Acid Treatment 2706.60 2718.20 0
1977-02-18 Cement Squeeze 2706.60 2733.40 0
1977-02-22 Cement Squeeze 2706.60 2733.40 0
1977-02-27 Perforation 2718.50 2720.00 3
1977-02-27 Perforation 2740.50 2742.00 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8276 0.0 0.0 0.0
1968 7563 0.0 0.0 0.0
1969 6040 0.0 0.0 0.0
1970 5371 0.0 0.0 0.0
1971 6301 0.0 0.0 0.0
1972 5560 0.0 0.0 0.0
1973 3450 0.0 0.0 0.0
1974 1436 0.0 0.0 0.0
1981 3746 0.0 0.0 0.0
1982 2972 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

References