X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635112914000

Well Details

Well ID: 0635112914000
Loading map...
Location: 00/14-29-063-11W5/0
Location Alias: 00/14-29-63-11 W5M
Location Alias 2: 00/14-29-063-11 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 11
Section: 29
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 14-29-63-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0076575
License Date: 1979-06-26
License Status: Suspension
Spud Date: 1979-09-08
Final Drill Date: 1979-10-03
Well Total Depth: 2814.00 m
Surface Hole Latitude: 54.481780
Surface Hole Longitude: -115.635047

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-26 Obtained License
1979-09-08 Direction Drilling Operation Performed - 98
1979-10-03 Finished Drilling
1979-10-03 Well Mode changed to Drilled and Cased
1979-10-07 Production Casing Operation Performed
1980-01-10 Perforation Treatment Performed - Jet Perforation
1980-01-15 Perforation Treatment Performed - Fractured
1980-04-15 Well Began Production
1980-04-15 Well Fluid changed to Crude Oil
1980-04-15 Well Mode changed to Flowing
1983-01-21 Well Fluid changed to Crude Oil
1983-01-21 Well Mode changed to Gas Lift
1983-09-27 Well Log Performed
1983-09-28 Perforation Treatment Performed - Jet Perforation
1983-09-29 Perforation Treatment Performed - Cement Squeeze
1988-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-27 Well Log Performed
1988-07-05 Well Log Performed
1988-07-15 Perforation Treatment Performed - Jet Perforation
1988-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-21 Well Fluid changed to Crude Oil
1994-10-21 Well Mode changed to Suspended
1997-04-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-25 Plug Back Performed
1997-04-25 Well Fluid changed to Crude Oil
1997-04-25 Well Mode changed to Abandoned Zone
2007-11-20 Perforation Treatment Performed - Jet Perforation
2007-11-25 Perforation Treatment Performed - Cement Squeeze
2008-06-02 Perforation Treatment Performed - Jet Perforation
2008-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-06-10 Well Fluid changed to Crude Oil
2008-06-10 Well Mode changed to Gas Lift
2008-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-27 Well Fluid changed to Crude Oil
2008-08-27 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1979-09-08 1479.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-01-10 Perforation 2753.00 2754.00 7
1980-01-10 Perforation 2775.50 2776.30 7
1980-01-10 Perforation 2777.00 2778.00 7
1980-01-10 Perforation 2779.70 2780.30 7
1980-01-15 Fracture 2753.00 2780.30 0
1983-09-28 Perforation 2740.00 2742.00 7
1983-09-28 Perforation 2743.50 2745.00 7
1983-09-29 Cement Squeeze 2740.00 2745.00 0
1988-06-25 Acid Treatment 2753.00 2780.30 0
1988-07-15 Perforation 2742.00 2743.50 7
1988-07-15 Perforation 2745.00 2747.00 7
1980-01-10 Perforation 2754.50 2756.00 7
1988-07-15 Perforation 2749.00 2753.00 7
1988-07-15 Perforation 2785.50 2794.50 7
1988-07-15 Perforation 2796.00 2798.00 7
1988-07-17 Acid Treatment 2742.00 2798.00 0
1997-04-25 Packing Device Capped w/Cement 2717.00 2725.00 0
2007-11-20 Perforation 2740.00 2742.00 7
2007-11-20 Perforation 2742.00 2743.50 7
2007-11-20 Perforation 2742.00 2747.00 7
2007-11-20 Perforation 2749.00 2753.00 7
2007-11-20 Perforation 2753.00 2754.00 7
1980-01-10 Perforation 2757.00 2758.00 7
2007-11-20 Perforation 2754.50 2756.00 7
2007-11-20 Perforation 2757.00 2758.00 7
2007-11-20 Perforation 2758.50 2759.50 7
2007-11-20 Perforation 2761.00 2762.00 7
2007-11-20 Perforation 2762.50 2763.50 7
2007-11-20 Perforation 2769.50 2771.00 7
2007-11-20 Perforation 2772.50 2773.20 7
2007-11-20 Perforation 2773.80 2774.50 7
2007-11-20 Perforation 2775.50 2776.30 7
2007-11-20 Perforation 2777.00 2778.00 7
1980-01-10 Perforation 2758.50 2759.50 7
2007-11-20 Perforation 2779.70 2780.30 7
2007-11-20 Perforation 2785.50 2794.50 7
2007-11-20 Perforation 2796.00 2798.00 7
2007-11-25 Cement Squeeze 2740.00 2780.30 0
2008-06-02 Perforation 2769.50 2771.00 7
2008-06-02 Perforation 2772.50 2778.00 7
2008-06-03 Acid Treatment 2769.50 2778.00 0
2008-08-27 Packing Device Capped w/Cement 2719.20 2727.50 0
1980-01-10 Perforation 2761.00 2762.00 7
1980-01-10 Perforation 2762.50 2763.50 7
1980-01-10 Perforation 2769.50 2771.00 7
1980-01-10 Perforation 2772.50 2773.20 7
1980-01-10 Perforation 2773.80 2774.50 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 6102 0.0 0.0 0.0
1981 5945 0.0 0.0 0.0
1982 5644 0.0 0.0 0.0
1983 6953 0.0 0.0 0.0
1984 8435 0.0 0.0 0.0
1985 7993 0.0 0.0 0.0
1986 7631 0.0 0.0 0.0
1987 6277 0.0 0.0 0.0
1988 6865 0.0 0.0 0.0
1989 7020 0.0 0.0 0.0
1990 8199 0.0 0.0 0.0
1991 8489 0.0 0.0 0.0
1992 8460 0.0 0.0 0.0
1993 8025 0.0 0.0 0.0
1994 2640 0.0 0.0 0.0
2008 74 0.0 0.0 0.0

For data sources see[6]

References