0635111904000

Well Details

Well ID: 0635111904000
Loading map...
Location: 00/04-19-063-11W5/0
Location Alias: 00/04-19-63-11 W5M
Location Alias 2: 00/04-19-063-11 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 11
Section: 19
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 4-19-63-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0019455
License Date: 1960-07-28
License Status: Suspension
Spud Date: 1960-08-02
Final Drill Date: 1960-10-10
Well Total Depth: 2762.10 m
Surface Hole Latitude: 54.459629
Surface Hole Longitude: -115.661815

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-07-28 Obtained License
1960-10-10 Finished Drilling
1960-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-10 Perforation Treatment Performed - Jet Perforation
1960-10-10 Production Casing Operation Performed
1960-10-10 Well Mode changed to Drilled and Cased
1960-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-10-12 Perforation Treatment Performed - Jet Perforation
1960-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-21 Perforation Treatment Performed - Jet Perforation
1960-10-30 Well Began Production
1960-10-30 Well Fluid changed to Crude Oil
1960-10-30 Well Mode changed to Flowing
1977-02-05 Perforation Treatment Performed - Jet Perforation
1977-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-04-07 Well Fluid changed to Crude Oil
1979-04-07 Well Mode changed to Gas Lift
1979-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-19 Perforation Treatment Performed - Jet Perforation
1981-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-01 Well Fluid changed to Crude Oil
1982-06-01 Well Mode changed to Suspended
1996-09-03 Perforation Treatment Performed - Cement Squeeze
1996-09-07 Perforation Treatment Performed - Jet Perforation
1996-09-07 Well Log Performed
1996-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-11 Perforation Treatment Performed - Cement Squeeze
1996-09-11 Well Log Performed
1996-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-22 Perforation Treatment Performed - Jet Perforation
1996-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-28 Plug Back Performed
1996-09-28 Well Fluid changed to Crude Oil
1996-09-28 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-10-10 Perforation 2683.20 2686.20 3
1977-02-05 Perforation 2635.30 2639.60 3
1977-02-05 Perforation 2646.30 2650.80 3
1977-02-05 Perforation 2657.90 2658.80 3
1977-02-09 Acid Treatment 2635.30 2658.80 0
1979-04-14 Acid Treatment 2635.30 2658.80 0
1981-09-19 Packing Device Capped w/Cement 2671.50 2671.50 0
1981-09-19 Perforation 2654.20 2656.00 7
1981-09-19 Perforation 2657.90 2658.80 7
1981-09-19 Perforation 2662.10 2663.60 7
1981-09-19 Perforation 2664.90 2666.70 7
1960-10-10 Acid Treatment 2683.20 2686.20 0
1981-09-21 Acid Treatment 2654.20 2666.70 0
1996-09-03 Cement Squeeze 2635.30 2644.40 0
1996-09-07 Perforation 2646.20 2651.10 7
1996-09-07 Perforation 2653.00 2656.00 13
1996-09-07 Perforation 2657.80 2659.10 13
1996-09-07 Perforation 2662.10 2663.60 13
1996-09-07 Perforation 2665.20 2666.70 13
1996-09-09 Acid Treatment 2646.20 2666.70 0
1996-09-11 Cement Squeeze 2635.30 2644.40 0
1996-09-16 Acid Treatment 2646.20 2666.70 0
1960-10-12 Packing Device Capped w/Cement 2680.40 2680.40 0
1996-09-19 Acid Treatment 2646.20 2666.70 0
1996-09-22 Perforation 2640.80 2644.40 13
1996-09-23 Acid Treatment 2640.80 2644.40 0
1996-09-28 Packing Device Capped w/Cement 2051.00 2624.00 0
1960-10-12 Perforation 2673.40 2674.90 3
1960-10-12 Perforation 2675.20 2676.80 3
1960-10-14 Acid Treatment 2673.40 2676.80 0
1960-10-20 Packing Device Capped w/Cement 2664.00 2664.00 0
1960-10-21 Perforation 2639.90 2644.40 3
1960-10-21 Acid Treatment 2639.90 2644.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7838 0.0 0.0 0.0
1968 7984 0.0 0.0 0.0
1969 6579 0.0 0.0 0.0
1970 8101 0.0 0.0 0.0
1971 7622 0.0 0.0 0.0
1972 7332 0.0 0.0 0.0
1973 6966 0.0 0.0 0.0
1974 4834 0.0 0.0 0.0
1979 1802 0.0 0.0 0.0
1981 1052 0.0 0.0 0.0
1989 0 0.0 0.0 0.0

For data sources see[5]