X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635103211000

Well Details

Well ID: 0635103211000
Loading map...
Location: 00/11-32-063-10W5/0
Location Alias: 00/11-32-63-10 W5M
Location Alias 2: 00/11-32-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 32
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 11-32-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0074267
License Date: 1979-02-01
License Status: Issued
Spud Date: 1979-07-01
Final Drill Date: 1979-07-22
Well Total Depth: 2646.00 m
Surface Hole Latitude: 54.498540
Surface Hole Longitude: -115.480245

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-02-01 Obtained License
1979-07-01 Direction Drilling Operation Performed - 98
1979-07-22 Finished Drilling
1979-07-22 Well Mode changed to Drilled and Cased
1979-07-27 Production Casing Operation Performed
1979-12-03 Perforation Treatment Performed - Jet Perforation
1979-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-11 Perforation Treatment Performed - Jet Perforation
1979-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-06 Well Began Production
1980-03-06 Well Fluid changed to Crude Oil
1980-03-06 Well Mode changed to Gas Lift
1981-04-01 Well Fluid changed to Crude Oil
1981-04-01 Well Mode changed to Suspended
1985-05-24 Well Fluid changed to Crude Oil
1985-05-24 Well Mode changed to Gas Lift
1987-08-19 Well Log Performed
1987-08-30 Perforation Treatment Performed - Open-Hole Completion
1987-08-31 Well Log Performed
1987-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-05-07 Well Log Performed
2011-05-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-05-20 Perforation Treatment Performed - Jet Perforation
2011-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-19 Well Fluid changed to Crude Oil
2011-06-19 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1979-07-01 1351.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-03 Perforation 2587.70 2588.30 7
2011-05-20 Perforation 2604.70 2606.70 8
2011-05-20 Packing Device Capped w/Cement 2608.10 2610.00 0
2011-05-24 Acid Treatment 2600.30 2606.70 0
1979-12-03 Perforation 2591.70 2594.50 7
1979-12-03 Perforation 2600.30 2602.00 7
1979-12-03 Perforation 2604.80 2605.20 7
1979-12-06 Acid Treatment 2591.70 2602.00 0
1979-12-11 Perforation 2578.00 2585.00 7
1979-12-15 Acid Treatment 2578.00 2588.30 0
1987-08-30 Open Hole/Barefoot Completion 2612.50 2646.00 0
1987-09-01 Acid Treatment 2612.50 2646.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 4952 0.0 0.0 0.0
1981 798 0.0 0.0 0.0
1985 3622 0.0 0.0 0.0
1986 8074 0.0 0.0 0.0
1987 7046 0.0 0.0 0.0
1988 8537 0.0 0.0 0.0
1989 8388 0.0 0.0 0.0
1990 8690 0.0 0.0 0.0
1991 8070 0.0 0.0 0.0
1992 6316 0.0 0.0 0.0
1993 3084 0.0 0.0 0.0
1994 7214 0.0 0.0 0.0
1995 8587 0.0 0.0 0.0
1996 6413 0.0 0.0 0.0
1997 8551 0.0 0.0 0.0
1998 8336 0.0 0.0 0.0
1999 8371 0.0 0.0 0.0
2000 8642 0.0 0.0 0.0
2001 8504 0.0 0.0 0.0
2002 8512 0.0 0.0 0.0
2003 8174 0.0 0.0 0.0
2004 7642 0.0 0.0 0.0
2005 8566 0.0 0.0 0.0
2006 7923 0.0 0.0 0.0
2007 2636 0.0 0.0 0.0
2008 7282 0.0 0.0 0.0
2009 8475 0.0 0.0 0.0
2010 8456 0.0 0.0 0.0
2011 7499 0.0 0.0 0.0
2012 8635 0.0 0.0 0.0
2013 7894 0.0 0.0 0.0
2014 8358 0.0 0.0 0.0
2015 8096 0.0 0.0 0.0
2016 8572 0.0 0.0 0.0
2017 8430 0.0 0.0 0.0
2018 8590 0.0 0.0 0.0
2019 8650 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[6]

References