X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635103006002

Well Details

Well ID: 0635103006002
Loading map...
Location: 00/06-30-063-10W5/2
Location Alias: 00/06-30-63-10 W5M
Location Alias 2: 00/06-30-063-10 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 30
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 6-30-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0017207
License Date: 1959-06-05
License Status: Issued
Spud Date: 1959-06-13
Final Drill Date: 1959-07-15
Well Total Depth: 2736.20 m
Surface Hole Latitude: 54.477698
Surface Hole Longitude: -115.503726

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-06-05 Obtained License
1959-07-15 Finished Drilling
1959-07-15 Well Mode changed to Drilled and Cased
1959-07-20 Drill Stem Test Performed
1959-07-22 Production Casing Operation Performed
1959-07-31 Perforation Treatment Performed - Jet Perforation
1959-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-05-17 Perforation Treatment Performed - Jet Perforation
1968-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-13 Perforation Treatment Performed - Jet Perforation
1968-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-11-18 Well Began Injection
1968-11-18 Well Fluid changed to Water
1968-11-18 Well Type changed to Injection
1970-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-08-12 Perforation Treatment Performed - Jet Perforation
1974-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-01 Well Fluid changed to Water
1986-07-01 Well Mode changed to Suspended
1986-07-01 Well Type changed to Injection
1988-10-07 Well Log Performed
1988-10-17 Well Log Performed
1988-10-21 Perforation Treatment Performed - Cement Squeeze
1988-10-24 Perforation Treatment Performed - Jet Perforation
1988-10-24 Well Log Performed
1988-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-22 Perforation Treatment Performed - Cement Squeeze
1995-08-25 Perforation Treatment Performed - Jet Perforation
1995-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-07-31 Perforation 2616.90 2618.10 3
1968-05-18 Acid Treatment 2606.00 2614.30 0
1968-08-13 Perforation 2663.00 2667.00 7
1968-08-14 Acid Treatment 2663.00 2667.00 0
1970-11-30 Acid Treatment 2663.00 2667.00 0
1971-06-19 Acid Treatment 2663.00 2667.00 0
1972-04-17 Acid Treatment 2663.00 2667.00 0
1974-08-12 Perforation 2631.00 2632.30 3
1974-08-12 Perforation 2634.10 2635.90 3
1974-08-12 Perforation 2636.50 2638.00 3
1974-08-12 Perforation 2638.70 2642.00 3
1959-07-31 Perforation 2619.50 2620.10 3
1974-08-12 Perforation 2644.10 2647.20 3
1974-08-12 Perforation 2648.10 2650.20 3
1974-08-12 Perforation 2650.80 2652.10 3
1974-08-12 Perforation 2658.80 2661.80 3
1974-08-14 Acid Treatment 2606.00 2667.00 0
1976-03-21 Acid Treatment 2631.00 2667.00 0
1979-11-18 Acid Treatment 2629.80 2667.00 0
1988-10-21 Cement Squeeze 2606.00 2667.00 0
1988-10-24 Perforation 2606.60 2616.00 7
1988-10-24 Perforation 2617.50 2619.10 7
1959-07-31 Perforation 2622.00 2622.30 3
1988-10-24 Perforation 2620.00 2621.30 7
1988-10-24 Perforation 2622.30 2625.20 7
1988-10-24 Perforation 2629.20 2632.20 7
1988-10-24 Perforation 2633.10 2642.90 7
1988-10-24 Perforation 2644.40 2647.20 7
1988-10-24 Perforation 2648.40 2653.60 7
1988-10-26 Acid Treatment 2606.60 2653.60 0
1995-08-22 Cement Squeeze 2606.60 2621.30 0
1995-08-25 Perforation 2617.60 2619.10 7
1995-08-25 Perforation 2620.00 2621.30 7
1959-07-31 Perforation 2623.10 2623.70 3
1995-08-25 Perforation 2622.20 2627.00 7
1995-08-25 Perforation 2630.40 2632.20 7
1995-08-25 Perforation 2634.00 2635.60 7
1995-08-25 Perforation 2638.60 2643.20 7
1995-08-25 Perforation 2645.60 2651.20 7
1995-08-26 Acid Treatment 2617.60 2653.60 0
1959-07-31 Perforation 2625.20 2625.90 3
1959-07-31 Perforation 2629.80 2630.40 3
1959-07-31 Perforation 2633.30 2634.20 3
1959-08-01 Acid Treatment 2616.90 2634.20 0
1968-05-17 Perforation 2606.00 2614.30 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1989 4799 0.0 0.0 0.0
1990 7452 0.0 0.0 0.0

For data sources see[5]

References