X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635102910000

Well Details

Well ID: 0635102910000
Loading map...
Location: 00/10-29-063-10W5/0
Location Alias: 00/10-29-63-10 W5M
Location Alias 2: 00/10-29-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 29
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 10-29-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0017928
License Date: 1959-10-09
License Status: Abandoned
Spud Date: 1959-11-10
Final Drill Date: 1959-12-06
Well Total Depth: 2678.30 m
Surface Hole Latitude: 54.481363
Surface Hole Longitude: -115.472573

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-10-09 Obtained License
1959-12-06 Finished Drilling
1959-12-06 Well Mode changed to Drilled and Cased
1959-12-08 Production Casing Operation Performed
1959-12-14 Perforation Treatment Performed - Jet Perforation
1959-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-08 Well Began Production
1960-01-08 Well Fluid changed to Crude Oil
1960-01-08 Well Mode changed to Flowing
1979-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-04-10 Perforation Treatment Performed - Jet Perforation
1979-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-04 Well Fluid changed to Crude Oil
1979-09-04 Well Mode changed to Pumping
1988-11-01 Well Fluid changed to Crude Oil
1988-11-01 Well Log Performed
1988-11-01 Well Mode changed to Suspended
1988-11-18 Perforation Treatment Performed - Cement Plug
1988-11-18 Plug Back Performed
1988-11-18 Well Abandoned
1988-11-18 Well Fluid changed to Crude Oil
1988-11-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-12-14 Perforation 2657.90 2660.30 3
1959-12-15 Acid Treatment 2657.90 2660.30 0
1979-04-10 Packing Device Capped w/Cement 2655.80 2656.60 0
1979-04-10 Perforation 2643.20 2644.10 6
1979-04-10 Perforation 2645.90 2648.10 6
1979-04-10 Perforation 2650.50 2651.80 6
1979-04-11 Acid Treatment 2643.20 2651.80 0
1988-11-18 Cement Plug 9.00 2626.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7855 0.0 0.0 0.0
1968 8028 0.0 0.0 0.0
1969 3700 0.0 0.0 0.0
1970 5797 0.0 0.0 0.0
1971 6782 0.0 0.0 0.0
1972 7641 0.0 0.0 0.0
1973 8061 0.0 0.0 0.0
1974 7756 0.0 0.0 0.0
1975 2475 0.0 0.0 0.0
1978 2194 0.0 0.0 0.0
1979 2450 0.0 0.0 0.0
1980 6706 0.0 0.0 0.0
1981 7811 0.0 0.0 0.0
1982 7914 0.0 0.0 0.0
1983 8654 0.0 0.0 0.0
1984 8450 0.0 0.0 0.0
1985 7307 0.0 0.0 0.0
1986 8353 0.0 0.0 0.0
1987 8691 0.0 0.0 0.0
1988 7090 0.0 0.0 0.0

For data sources see[5]

References