X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635102814000

Well Details

Well ID: 0635102814000
Loading map...
Location: 00/14-28-063-10W5/0
Location Alias: 00/14-28-63-10 W5M
Location Alias 2: 00/14-28-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 28
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 14-28-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0150928
License Date: 1991-12-09
License Status: Suspension
Spud Date: 1991-12-28
Final Drill Date: 1992-01-08
Well Total Depth: 2685.00 m
Surface Hole Latitude: 54.484497
Surface Hole Longitude: -115.452635

For data sources see[1][2]

Well History

Date Event
1991-12-09 Obtained License
1991-12-29 Surface Casing Operation Performed
1992-01-08 Finished Drilling
1992-01-08 Well Log Performed
1992-01-08 Well Mode changed to Drilled and Cased
1992-01-10 Production Casing Operation Performed
1992-01-10 Rig Released
1992-02-26 Perforation Treatment Performed - Jet Perforation
1992-02-26 Well Log Performed
1992-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-17 Well Began Production
1992-03-17 Well Fluid changed to Crude Oil
1992-03-17 Well Mode changed to Pumping
1992-09-24 Perforation Treatment Performed - Jet Perforation
1992-09-24 Well Log Performed
1992-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-25 Well Fluid changed to Crude Oil
1994-03-25 Well Mode changed to Suspended
1995-06-13 Well Fluid changed to Crude Oil
1995-06-13 Well Mode changed to Pumping
1996-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-28 Well Log Performed
2008-09-13 Well Log Performed
2014-07-01 Well Fluid changed to Crude Oil
2014-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-02-26 Perforation 2608.00 2625.00 13
1992-02-28 Acid Treatment 2608.00 2625.00 0
1992-09-24 Perforation 2630.00 2641.00 13
1992-09-25 Acid Treatment 2630.00 2641.00 0
1996-05-26 Packing Device Capped w/Cement 2625.10 2628.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5131 0.0 0.0 0.0
1993 4835 0.0 0.0 0.0
1994 9 0.0 0.0 0.0
1995 4816 0.0 0.0 0.0
1996 8482 0.0 0.0 0.0
1997 8668 0.0 0.0 0.0
1998 7110 0.0 0.0 0.0
1999 8701 0.0 0.0 0.0
2000 7961 0.0 0.0 0.0
2001 8389 0.0 0.0 0.0
2002 8433 0.0 0.0 0.0
2003 8587 0.0 0.0 0.0
2004 8507 0.0 0.0 0.0
2005 8539 0.0 0.0 0.0
2006 7061 0.0 0.0 0.0
2007 1026 0.0 0.0 0.0
2008 6741 0.0 0.0 0.0
2009 6340 0.0 0.0 0.0
2010 8160 0.0 0.0 0.0
2011 7028 0.0 0.0 0.0
2012 5768 0.0 0.0 0.0
2013 4905 0.0 0.0 0.0

For data sources see[5]

References