X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635102812000

Well Details

Well ID: 0635102812000
Loading map...
Location: 00/12-28-063-10W5/0
Location Alias: 00/12-28-63-10 W5M
Location Alias 2: 00/12-28-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 28
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 12-28-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0020552
License Date: 1961-03-10
License Status: Amended
Spud Date: 1961-04-05
Final Drill Date: 1961-04-29
Well Total Depth: 2697.50 m
Surface Hole Latitude: 54.481414
Surface Hole Longitude: -115.459811

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-03-10 Obtained License
1961-04-29 Finished Drilling
1961-04-29 Well Mode changed to Drilled and Cased
1961-05-01 Production Casing Operation Performed
1961-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-05-04 Perforation Treatment Performed - Jet Perforation
1961-05-05 Well Began Production
1961-05-05 Well Fluid changed to Crude Oil
1961-05-05 Well Mode changed to Flowing
1972-11-11 Perforation Treatment Performed - Jet Perforation
1972-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-11-08 Well Fluid changed to Crude Oil
1973-11-08 Well Mode changed to Pumping
1982-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-02 Perforation Treatment Performed - Jet Perforation
1982-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-05 Well Log Performed
1993-12-18 Well Fluid changed to Crude Oil
1993-12-18 Well Mode changed to Suspended
1995-06-03 Perforation Treatment Performed - Jet Perforation
1995-06-09 Perforation Treatment Performed - Jet Perforation
1995-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-05 Well Began Injection
1995-07-05 Well Fluid changed to Solvent
1995-07-05 Well Type changed to Injection
1999-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-24 Plug Back Performed
2004-11-24 Well Fluid changed to Solvent
2004-11-24 Well Mode changed to Abandoned and Whipstocked
2004-11-24 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-05-04 Perforation 2651.50 2657.60 3
1982-06-02 Packing Device Capped w/Cement 2632.40 2633.90 0
1982-06-02 Perforation 2618.20 2619.80 7
1982-06-02 Perforation 2623.70 2626.50 7
1982-06-04 Acid Treatment 2618.20 2626.50 0
1995-06-03 Perforation 2634.40 2636.50 3
1995-06-03 Perforation 2637.70 2639.60 3
1995-06-03 Perforation 2640.80 2643.80 3
1995-06-03 Perforation 2651.50 2657.60 3
1995-06-09 Perforation 2618.80 2621.30 7
1995-06-09 Perforation 2626.80 2630.40 7
1961-05-04 Acid Treatment 2651.50 2657.60 0
1995-06-09 Perforation 2631.60 2633.80 7
1995-06-09 Perforation 2635.00 2637.10 7
1995-06-09 Perforation 2637.80 2642.00 7
1995-06-09 Perforation 2647.20 2648.10 7
1995-06-10 Acid Treatment 2618.20 2657.60 0
1999-09-04 Acid Treatment 2647.20 2657.60 0
2000-03-05 Acid Treatment 2647.20 2657.60 0
2000-09-25 Acid Treatment 2618.20 2657.60 0
2001-05-05 Acid Treatment 2618.20 2657.50 0
2002-11-26 Acid Treatment 2618.20 2657.50 0
1972-11-11 Perforation 2619.80 2624.30 3
2004-03-16 Acid Treatment 2618.20 2657.50 0
2004-11-24 Packing Device Capped w/Cement 2587.00 2595.00 0
1972-11-11 Perforation 2626.50 2628.60 3
1972-11-11 Perforation 2629.50 2632.90 3
1972-11-11 Perforation 2634.40 2636.50 3
1972-11-11 Perforation 2637.70 2639.60 3
1972-11-11 Perforation 2640.80 2643.80 3
1972-11-13 Acid Treatment 2619.80 2657.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1967 372 0.0 0.0 0.0
1968 7332 0.0 0.0 0.0
1969 3553 0.0 0.0 0.0
1970 6699 0.0 0.0 0.0
1971 5156 0.0 0.0 0.0
1972 8028 0.0 0.0 0.0
1973 6766 0.0 0.0 0.0
1974 6369 0.0 0.0 0.0
1975 2064 0.0 0.0 0.0
1977 3657 0.0 0.0 0.0
1978 1616 0.0 0.0 0.0
1979 8172 0.0 0.0 0.0
1980 7526 0.0 0.0 0.0
1981 7101 0.0 0.0 0.0
1982 8237 0.0 0.0 0.0
1983 8659 0.0 0.0 0.0
1984 8109 0.0 0.0 0.0
1985 8323 0.0 0.0 0.0
1986 8394 0.0 0.0 0.0
1987 8377 0.0 0.0 0.0
1988 8486 0.0 0.0 0.0
1989 8491 0.0 0.0 0.0
1990 8622 0.0 0.0 0.0
1991 7585 0.0 0.0 0.0
1992 8304 0.0 0.0 0.0
1993 7137 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0

For data sources see[5]

References