0635102712000

Well Details

Well ID: 0635102712000
Loading map...
Location: 00/12-27-063-10W5/0
Location Alias: 00/12-27-63-10 W5M
Location Alias 2: 00/12-27-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 27
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 12-27-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0022972
License Date: 1962-09-07
License Status: Abandoned
Spud Date: 1962-09-16
Final Drill Date: 1962-10-03
Well Total Depth: 2692.60 m
Surface Hole Latitude: 54.481433
Surface Hole Longitude: -115.435787

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-09-07 Obtained License
1962-10-03 Finished Drilling
1962-10-03 Well Mode changed to Drilled and Cased
1962-10-04 Production Casing Operation Performed
1962-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-07 Perforation Treatment Performed - Jet Perforation
1962-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-18 Perforation Treatment Performed - Jet Perforation
1962-10-26 Perforation Treatment Performed - Cement Squeeze
1962-10-27 Perforation Treatment Performed - Jet Perforation
1962-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-11-09 Well Began Production
1962-11-09 Well Fluid changed to Crude Oil
1962-11-09 Well Mode changed to Flowing
1973-02-11 Perforation Treatment Performed - Jet Perforation
1973-02-12 Well Fluid changed to Crude Oil
1973-02-12 Well Mode changed to Pumping
1974-02-12 Well Began Injection
1974-02-12 Well Fluid changed to Water
1974-02-12 Well Type changed to Injection
1974-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-24 Perforation Treatment Performed - Jet Perforation
1980-02-27 Perforation Treatment Performed - Jet Perforation
1980-02-29 Perforation Treatment Performed - Fractured
1991-08-15 Well Fluid changed to Water
1991-08-15 Well Mode changed to Suspended
1991-08-15 Well Type changed to Injection
2001-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-05 Plug Back Performed
2001-02-05 Well Fluid changed to Water
2001-02-05 Well Mode changed to Abandoned Zone
2001-02-05 Well Type changed to Injection
2001-02-06 Perforation Treatment Performed - Jet Perforation
2001-02-08 Perforation Treatment Performed - Cement Squeeze
2001-02-12 Perforation Treatment Performed - Jet Perforation
2001-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-15 Plug Back Performed
2002-12-12 Perforation Treatment Performed - Jet Perforation
2002-12-12 Well Log Performed
2002-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-14 Plug Back Performed
2002-12-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-10-07 Perforation 2681.30 2684.10 7
1973-02-11 Perforation 2621.30 2624.30 7
1974-03-26 Acid Treatment 2613.40 2624.30 0
1980-02-24 Perforation 2624.30 2634.10 7
1980-02-27 Perforation 2624.30 2634.10 7
1980-02-29 Fracture 2613.40 2634.10 0
2001-02-05 Packing Device Capped w/Cement 2594.00 2602.00 0
2001-02-06 Perforation 1432.00 1433.00 13
2001-02-06 Perforation 1366.00 1367.00 13
2001-02-08 Cement Squeeze 1432.00 1433.00 0
2001-02-08 Cement Squeeze 1366.00 1367.00 0
1962-10-07 Acid Treatment 2681.30 2684.10 0
2001-02-12 Perforation 1403.90 1407.60 17
2001-02-14 Acid Treatment 1403.90 1407.60 0
2002-01-15 Packing Device Capped w/Cement 1387.00 1395.00 0
2002-01-15 Packing Device Capped w/Cement 1352.00 1360.00 0
2002-12-12 Perforation 600.00 601.00 14
2002-12-14 Packing Device Capped w/Cement 550.00 619.00 0
1962-10-18 Perforation 2653.00 2654.20 3
1962-10-18 Perforation 2659.10 2661.50 3
1962-10-18 Acid Treatment 2653.00 2684.10 0
1962-10-26 Cement Squeeze 2646.60 2684.10 0
1962-10-27 Perforation 2613.40 2618.80 3
1962-10-28 Acid Treatment 2613.40 2618.80 0
1973-02-11 Perforation 2618.80 2620.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1968 4194 0.0 0.0 0.0
1969 3085 0.0 0.0 0.0
1970 2975 0.0 0.0 0.0
1971 2027 0.0 0.0 0.0
1972 3731 0.0 0.0 0.0
1973 3817 0.0 0.0 0.0
1974 719 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0

For data sources see[5]

References