X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635100302002

Well Details

Well ID: 0635100302002
Loading map...
Location: 00/02-03-063-10W5/2
Location Alias: 00/02-03-63-10 W5M
Location Alias 2: 00/02-03-063-10 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 03
County/Municipality: Woodlands County
Well Name: SECOND WAVE JUDYCK 2-3-63-10
Operator Name: Crescent Point Energy Corp.
License Number: 0422156
License Date: 2010-07-26
License Status: Suspension
Spud Date: 2010-08-25
Final Drill Date: 2010-09-18
Well Total Depth: 2515.00 m
Surface Hole Latitude: 54.414859
Surface Hole Longitude: -115.437104

For data sources see[1][2]

Well History

Date Event
2010-07-26 Obtained License
2010-08-24 Surface Casing Operation Performed
2010-09-03 Direction Drilling Operation Performed - Horizontal
2010-09-08 Well Log Performed
2010-09-09 Intermediate Casing Operation Performed
2010-09-17 Well Log Performed
2010-09-18 Finished Drilling
2010-09-18 Well Mode changed to Drilled and Cased
2010-09-19 Liner Casing Operation Performed
2010-09-20 Rig Released
2010-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-31 Perforation Treatment Performed - Open-Hole Completion
2010-11-04 Well Began Production
2010-11-04 Well Fluid changed to Crude Oil
2010-11-04 Well Mode changed to Pumping
2015-07-01 Well Fluid changed to Crude Oil
2015-07-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-09-03 1208.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-31 Open Hole/Barefoot Completion 2410.30 2515.00 0
2010-10-31 Multi-Stage Fracture 1775.80 1775.90 0
2010-10-31 Multi-Stage Fracture 1871.90 1872.00 0
2010-10-31 Multi-Stage Fracture 1968.70 1968.80 0
2010-10-31 Multi-Stage Fracture 2065.30 2065.40 0
2010-10-31 Multi-Stage Fracture 2161.60 2161.70 0
2010-10-31 Multi-Stage Fracture 2258.10 2258.20 0
2010-10-31 Multi-Stage Fracture 2354.60 2354.70 0
2010-10-31 Multi-Stage Fracture 2405.80 2405.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 351 0.0 0.0 0.0

For data sources see[6]

References