X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635092805000

Well Details

Well ID: 0635092805000
Loading map...
Location: 00/05-28-063-09W5/0
Location Alias: 00/05-28-63-09 W5M
Location Alias 2: 00/05-28-063-09 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 09
Section: 28
County/Municipality: Woodlands County
Well Name: SECOND WAVE HZ JUDYCK 5-28-63-9
Operator Name: Crescent Point Energy Corp.
License Number: 0441776
License Date: 2011-12-20
License Status: Issued
Spud Date: 2012-03-14
Final Drill Date: 2012-04-02
Well Total Depth: 4228.00 m
Surface Hole Latitude: 54.478707
Surface Hole Longitude: -115.335035

For data sources see[1][2]

Well History

Date Event
2011-12-20 Obtained License
2012-03-15 Surface Casing Operation Performed
2012-03-21 Direction Drilling Operation Performed - Deviate
2012-03-23 Direction Drilling Operation Performed - Horizontal
2012-03-24 Intermediate Casing Operation Performed
2012-04-02 Finished Drilling
2012-04-02 Well Mode changed to Drilled and Cased
2012-04-03 Liner Casing Operation Performed
2012-04-03 Well Began Production
2012-04-03 Well Fluid changed to Crude Oil
2012-04-03 Well Mode changed to Pumping
2012-04-04 Rig Released
2012-04-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-12 Perforation Treatment Performed - Open-Hole Completion
2012-04-26 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-14 Ensign Drilling Inc. 113 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-21 2231.30 Deviate (5 - 79 degrees)
2012-03-23 2640.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-12 Multi-Stage Fracture 4222.60 4223.60 0
2012-04-12 Multi-Stage Fracture 3224.40 3225.40 0
2012-04-12 Multi-Stage Fracture 3116.70 3117.70 0
2012-04-12 Multi-Stage Fracture 3010.80 3011.80 0
2012-04-12 Multi-Stage Fracture 2904.20 2905.20 0
2012-04-12 Multi-Stage Fracture 2798.00 2799.00 0
2012-04-12 Multi-Stage Fracture 2713.70 2714.70 0
2012-04-12 Open Hole/Barefoot Completion 4227.00 4228.00 0
2012-04-12 Multi-Stage Fracture 4120.30 4121.30 0
2012-04-12 Multi-Stage Fracture 4018.70 4019.70 0
2012-04-12 Multi-Stage Fracture 3904.40 3905.40 0
2012-04-12 Multi-Stage Fracture 3794.70 3795.70 0
2012-04-12 Multi-Stage Fracture 3680.90 3681.90 0
2012-04-12 Multi-Stage Fracture 3562.50 3563.50 0
2012-04-12 Multi-Stage Fracture 3450.50 3451.50 0
2012-04-12 Multi-Stage Fracture 3331.80 3332.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5334 0.0 0.0 0.0
2013 8619 0.0 0.0 0.0
2014 8701 0.0 0.0 0.0
2015 8444 0.0 0.0 0.0
2016 8744 0.0 0.0 0.0
2017 8701 0.0 0.0 0.0
2018 8741 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-05 No Incident Encountered 0.00 0.00
2012-04-27 No Incident Encountered 0.00 0.00

For data sources see[8]

References