X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635091408000

Well Details

Well ID: 0635091408000
Loading map...
Location: 00/08-14-063-09W5/0
Location Alias: 00/08-14-63-09 W5M
Location Alias 2: 00/08-14-063-09 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 09
Section: 14
County/Municipality: Woodlands County
Well Name: SECOND WAVE HZ JUDYCK 8-14-63-9
Operator Name: Crescent Point Energy Corp.
License Number: 0432394
License Date: 2011-03-17
License Status: Suspension
Spud Date: 2011-05-18
Final Drill Date: 2011-06-11
Well Total Depth: 4030.00 m
Surface Hole Latitude: 54.447822
Surface Hole Longitude: -115.264867

For data sources see[1][2]

Well History

Date Event
2011-03-17 Obtained License
2011-05-20 Surface Casing Operation Performed
2011-05-20 Well Log Performed
2011-05-24 Direction Drilling Operation Performed - Deviate
2011-05-27 Direction Drilling Operation Performed - Horizontal
2011-05-30 Intermediate Casing Operation Performed
2011-06-11 Finished Drilling
2011-06-11 Well Mode changed to Drilled and Cased
2011-06-13 Liner Casing Operation Performed
2011-06-14 Rig Released
2011-06-22 Perforation Treatment Performed - Multi-Stage Fracture
2011-06-22 Perforation Treatment Performed - Open-Hole Completion
2011-06-27 Well Log Performed
2011-07-09 Well Began Production
2011-07-09 Well Fluid changed to Crude Oil
2011-07-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-05-24 2159.30 Deviate (5 - 79 degrees)
2011-05-27 2540.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-06-22 Multi-Stage Fracture 2621.30 2621.40 0
2011-06-22 Multi-Stage Fracture 3495.80 3495.90 0
2011-06-22 Multi-Stage Fracture 3593.00 3593.10 0
2011-06-22 Multi-Stage Fracture 3690.20 3690.30 0
2011-06-22 Multi-Stage Fracture 3787.30 3787.40 0
2011-06-22 Multi-Stage Fracture 3884.50 3884.60 0
2011-06-22 Multi-Stage Fracture 4005.00 4005.10 0
2011-06-22 Open Hole/Barefoot Completion 4010.00 4030.00 0
2011-06-22 Multi-Stage Fracture 2718.60 2718.70 0
2011-06-22 Multi-Stage Fracture 2816.00 2816.10 0
2011-06-22 Multi-Stage Fracture 2913.20 2913.30 0
2011-06-22 Multi-Stage Fracture 3010.40 3010.50 0
2011-06-22 Multi-Stage Fracture 3107.60 3107.70 0
2011-06-22 Multi-Stage Fracture 3204.70 3204.80 0
2011-06-22 Multi-Stage Fracture 3302.00 3302.10 0
2011-06-22 Multi-Stage Fracture 3398.90 3399.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4063 0.0 0.0 0.0
2012 8081 0.0 0.0 0.0
2013 7181 0.0 0.0 0.0
2014 5452 0.0 0.0 0.0
2015 5658 0.0 0.0 0.0
2016 5078 0.0 0.0 0.0
2017 2160 0.0 0.0 0.0
2018 320 0.0 0.0 0.0

For data sources see[6]

References