X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635062607000

Well Details

Well ID: 0635062607000
Loading map...
Location: 00/07-26-063-06W5/0
Location Alias: 00/07-26-63-06 W5M
Location Alias 2: 00/07-26-063-06 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 06
Section: 26
County/Municipality: Woodlands County
Well Name: AMOCO DORIS 7-26-63-6
Operator Name: BP Canada Energy Group ULC
License Number: 0053102
License Date: 1975-02-28
License Status: RecCertified
Spud Date: 1975-03-07
Final Drill Date: 1975-03-17
Well Total Depth: 1168.60 m
Surface Hole Latitude: 54.477592
Surface Hole Longitude: -114.791995

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-02-28 Obtained License
1975-03-17 Finished Drilling
1975-03-18 Drill Stem Test Performed
1975-03-20 Production Casing Operation Performed
1975-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-12 Perforation Treatment Performed - Acid Wash - No Pressure
1975-06-12 Perforation Treatment Performed - Jet Perforation
1975-06-19 Perforation Treatment Performed - Cement Squeeze
1975-06-21 Perforation Treatment Performed - Cement Squeeze
1975-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-23 Perforation Treatment Performed - Acid Wash - No Pressure
1975-06-23 Perforation Treatment Performed - Jet Perforation
1975-07-10 Perforation Treatment Performed - Jet Perforation
1975-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-07-16 Well Mode changed to Drilled and Cased
1986-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-01-06 Plug Back Performed
1986-01-06 Well Abandoned
1986-01-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-06-12 Perforation 1139.30 1142.10 7
1975-07-11 Acid Treatment 1140.00 1141.80 0
1986-01-06 Packing Device Capped w/Cement 1137.00 1145.00 0
1986-01-06 Packing Device Capped w/Cement 1121.10 1129.00 0
1975-06-12 Acid Wash 1139.30 1142.10 0
1975-06-12 Acid Treatment 1139.30 1142.10 0
1975-06-19 Cement Squeeze 1139.30 1142.10 0
1975-06-21 Cement Squeeze 1139.30 1142.10 0
1975-06-23 Perforation 1146.00 1147.00 7
1975-06-23 Acid Wash 1146.00 1147.00 0
1975-06-23 Acid Treatment 1146.00 1147.00 0
1975-07-10 Perforation 1140.00 1141.80 7

For data sources see[4]



References