X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634212410002

Well Details

Well ID: 0634212410002
Loading map...
Location: 00/10-24-063-21W4/2
Location Alias: 00/10-24-63-21 W4M
Location Alias 2: 00/10-24-063-21 W4/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 21
Section: 24
County/Municipality: Athabasca County
Well Name: ACL JILES 10-24-63-21
Operator Name: Paramount Resources Ltd.
License Number: 0055064
License Date: 1975-09-23
License Status: Abandoned
Spud Date: 1975-09-28
Final Drill Date: 1975-10-01
Well Total Depth: 765.00 m
Surface Hole Latitude: 54.465667
Surface Hole Longitude: -113.038004

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-23 Obtained License
1975-10-01 Finished Drilling
1975-10-02 Well Log Performed
1975-10-03 Drill Stem Test Performed
1975-10-04 Production Casing Operation Performed
1975-10-05 Well Mode changed to Drilled and Cased
1975-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-05 Perforation Treatment Performed - Jet Perforation
1975-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-07 Perforation Treatment Performed - Jet Perforation
1976-11-26 Well Began Production
1976-11-26 Well Fluid changed to Gas
1976-11-26 Well Mode changed to Flowing
1984-03-30 Well Fluid changed to Gas
1984-03-30 Well Mode changed to Suspended
1984-08-21 Perforation Treatment Performed - Jet Perforation
1984-08-21 Well Log Performed
1991-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-06-11 Plug Back Performed
1991-06-25 Well Abandoned
1991-06-25 Well Fluid changed to Gas
1991-06-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-05 Perforation 721.80 723.60 7
1975-11-05 Acid Treatment 721.80 723.60 0
1975-11-07 Perforation 617.50 619.70 7
1975-11-07 Acid Treatment 617.50 619.70 0
1984-08-21 Perforation 719.30 723.60 13
1991-06-11 Packing Device Capped w/Cement 604.00 614.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 648 0.0 0.0 0.0
1977 6329 0.0 0.0 0.0
1978 6041 0.0 0.0 0.0
1979 6003 0.0 0.0 0.0
1980 4682 0.0 0.0 0.0
1981 3663 0.0 0.0 0.0
1982 3011 0.0 0.0 0.0

For data sources see[5]

References