If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0634192212002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/12-22-063-19W4/2 | |
| Location Alias: 00/12-22-63-19 W4M | |
| Location Alias 2: 00/12-22-063-19 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 063 | |
| Meridian: 4 | |
| Range: 19 | |
| Section: 22 | |
| County/Municipality: Thorhild County | |
| Well Name: ACL ALPEN 12-22-63-19 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0139566 | |
| License Date: 1989-04-12 | |
| License Status: Abandoned | |
| Spud Date: 1989-07-01 | |
| Final Drill Date: 1989-07-03 | |
| Well Total Depth: 735.00 m | |
| Surface Hole Latitude: 54.463561 | |
| Surface Hole Longitude: -112.799824 |
| Date | Event |
|---|---|
| 1989-04-12 | Obtained License |
| 1989-07-01 | Surface Casing Operation Performed |
| 1989-07-03 | Finished Drilling |
| 1989-07-04 | Production Casing Operation Performed |
| 1989-07-04 | Well Log Performed |
| 1989-07-05 | Rig Released |
| 1989-07-06 | Perforation Treatment Performed - Jet Perforation |
| 1989-07-07 | Perforation Treatment Performed - Remedial Casing |
| 1989-07-09 | Perforation Treatment Performed - Open-Hole Completion |
| 1989-07-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1989-07-10 | Perforation Treatment Performed - Jet Perforation |
| 1991-11-28 | Perforation Treatment Performed - Jet Perforation |
| 1991-11-28 | Well Mode changed to Drilled and Cased |
| 2002-12-23 | Well Began Production |
| 2002-12-23 | Well Fluid changed to Gas |
| 2002-12-23 | Well Mode changed to Flowing |
| 2003-02-09 | Well Fluid changed to Gas |
| 2003-02-09 | Well Mode changed to Suspended |
| 2004-09-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-09-27 | Perforation Treatment Performed - Jet Perforation |
| 2004-09-27 | Plug Back Performed |
| 2004-09-27 | Well Fluid changed to Gas |
| 2004-09-27 | Well Log Performed |
| 2004-09-27 | Well Mode changed to Abandoned Zone |
| 2004-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-04-05 | Well Abandoned |
| 2008-04-05 | Well Fluid changed to Gas |
| 2008-04-05 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1989-07-06 | Perforation | 418.00 | 419.00 | 13 |
| 2004-09-28 | Packing Device Capped w/Cement | 407.00 | 415.00 | 0 |
| 2004-09-29 | Packing Device Capped w/Cement | 342.00 | 350.00 | 0 |
| 1989-07-07 | Remedial Casing Cementing | 418.00 | 419.00 | 0 |
| 1989-07-09 | Open Hole/Barefoot Completion | 732.00 | 732.40 | 0 |
| 1989-07-10 | Packing Device Capped w/Cement | 717.00 | 725.00 | 0 |
| 1989-07-10 | Perforation | 569.00 | 571.00 | 13 |
| 1991-11-28 | Perforation | 526.00 | 528.00 | 13 |
| 2004-09-27 | Packing Device Capped w/Cement | 557.00 | 565.00 | 0 |
| 2004-09-27 | Perforation | 353.00 | 354.00 | 17 |
| 2004-09-27 | Packing Device Capped w/Cement | 515.00 | 523.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2003 | 740 | 0.0 | 0.0 | 0.0 |
For data sources see[5]