If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0634181305000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.448301,"lon":-112.600207,"icon":""}]} |
Location: 00/05-13-063-18W4/0 | |
Location Alias: 00/05-13-63-18 W4M | |
Location Alias 2: 00/05-13-063-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 4 | |
Range: 18 | |
Section: 13 | |
County/Municipality: Thorhild County | |
Well Name: BVE FIGURE LAKE 5-13-63-18 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0163444 | |
License Date: 1993-12-22 | |
License Status: RecCertified | |
Spud Date: 1994-02-02 | |
Final Drill Date: 1994-02-05 | |
Well Total Depth: 657.00 m | |
Surface Hole Latitude: 54.448301 | |
Surface Hole Longitude: -112.600207 |
Date | Event |
---|---|
1993-12-22 | Obtained License |
1994-01-05 | Well Log Performed |
1994-02-03 | Surface Casing Operation Performed |
1994-02-05 | Finished Drilling |
1994-02-05 | Well Mode changed to Drilled and Cased |
1994-02-06 | Well Log Performed |
1994-02-07 | Drill Stem Test Performed |
1994-02-08 | Production Casing Operation Performed |
1994-02-08 | Rig Released |
1994-02-17 | Perforation Treatment Performed - Jet Perforation |
1994-12-10 | Well Began Production |
1994-12-10 | Well Fluid changed to Gas |
1994-12-10 | Well Mode changed to Flowing |
1997-03-25 | Perforation Treatment Performed - Cement Squeeze |
1997-03-25 | Well Fluid changed to Gas |
1997-03-25 | Well Mode changed to Abandoned Zone |
1997-11-26 | Well Abandoned |
1997-11-26 | Well Fluid changed to Gas |
1997-11-26 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-02-17 | Perforation | 520.00 | 521.00 | 13 |
1994-02-17 | Perforation | 521.00 | 524.00 | 13 |
1997-03-25 | Cement Squeeze | 520.00 | 524.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 520 | 0.0 | 0.0 | 0.0 |
1995 | 1703 | 0.0 | 0.0 | 0.0 |
For data sources see[5]