X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634181114000

Well Details

Well ID: 0634181114000
Loading map...
Location: 00/14-11-063-18W4/0
Location Alias: 00/14-11-63-18 W4M
Location Alias 2: 00/14-11-063-18 W4/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 18
Section: 11
County/Municipality: Thorhild County
Well Name: ACL FIGURE LAKE 14-11-63-18
Operator Name: Paramount Resources Ltd.
License Number: 0151865
License Date: 1992-02-27
License Status: Issued
Spud Date: 1992-03-02
Final Drill Date: 1992-03-07
Well Total Depth: 617.00 m
Surface Hole Latitude: 54.439955
Surface Hole Longitude: -112.617383

For data sources see[1][2]

Well History

Date Event
1992-02-27 Obtained License
1992-03-05 Direction Drilling Operation Performed - Deviate
1992-03-05 Surface Casing Operation Performed
1992-03-07 Finished Drilling
1992-03-07 Well Log Performed
1992-03-07 Well Mode changed to Drilled and Cased
1992-03-08 Production Casing Operation Performed
1992-03-08 Rig Released
1992-03-09 Perforation Treatment Performed - Jet Perforation
1992-03-09 Well Log Performed
1992-03-10 Well Log Performed
1992-03-12 Perforation Treatment Performed - Cement Squeeze
1992-03-14 Perforation Treatment Performed - Jet Perforation
1992-12-02 Perforation Treatment Performed - Jet Perforation
1994-03-06 Well Began Production
1994-03-06 Well Fluid changed to Gas
1994-03-06 Well Mode changed to Flowing
1995-11-01 Well Fluid changed to Gas
1995-11-01 Well Mode changed to Suspended
1996-12-12 Well Fluid changed to Gas
1996-12-12 Well Mode changed to Flowing
2018-12-31 Well Fluid changed to Gas
2018-12-31 Well Mode changed to Suspended
2020-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-08 Plug Back Performed
2020-01-08 Well Fluid changed to Gas
2020-01-08 Well Mode changed to Abandoned Zone
2020-01-09 Perforation Treatment Performed - Cement Plug
2020-01-09 Perforation Treatment Performed - Cement Squeeze
2020-01-09 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-03-05 171.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-03-09 Perforation 563.50 566.50 13
2020-01-09 Cement Plug 448.00 486.10 0
1992-03-12 Cement Squeeze 563.00 566.50 0
1992-03-14 Perforation 563.50 564.50 13
1992-03-14 Perforation 551.50 552.50 13
1992-03-14 Perforation 554.50 555.50 13
1992-03-14 Perforation 557.50 559.50 13
1992-12-02 Perforation 500.00 509.00 13
2020-01-08 Packing Device Capped w/Cement 534.60 544.60 0
2020-01-09 Cement Squeeze 500.00 509.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 6706 0.0 0.0 0.0
1995 7774 0.0 0.0 0.0
1996 476 0.0 0.0 0.0
1997 3042 0.0 0.0 0.0
1998 2866 0.0 0.0 0.0
1999 8638 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8729 0.0 0.0 0.0
2002 8688 0.0 0.0 0.0
2003 8375 0.0 0.0 0.0
2004 8782 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8550 0.0 0.0 0.0
2010 8757 0.0 0.0 0.0
2011 8450 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8755 0.0 0.0 0.0
2014 8737 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8763 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 6506 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References