X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634172513000

Well Details

Well ID: 0634172513000
Loading map...
Location: 00/13-25-063-17W4/0
Location Alias: 00/13-25-63-17 W4M
Location Alias 2: 00/13-25-063-17 W4/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 17
Section: 25
County/Municipality: Buffalo Lake Metis Settlement
Well Name: ACL FIGURE LAKE 13-25-63-17
Operator Name: Paramount Resources Ltd.
License Number: 0184209
License Date: 1996-01-05
License Status: Abandoned
Spud Date: 1996-02-28
Final Drill Date: 1996-03-01
Well Total Depth: 614.00 m
Surface Hole Latitude: 54.485145
Surface Hole Longitude: -112.449382

For data sources see[1][2]

Well History

Date Event
1996-01-05 Obtained License
1996-02-29 Surface Casing Operation Performed
1996-03-01 Finished Drilling
1996-03-01 Production Casing Operation Performed
1996-03-01 Rig Released
1996-03-01 Well Log Performed
1996-03-01 Well Mode changed to Drilled and Cased
1996-03-07 Well Log Performed
1996-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-08 Perforation Treatment Performed - Jet Perforation
1996-09-23 Well Began Production
1996-09-23 Well Fluid changed to Gas
1996-09-23 Well Mode changed to Flowing
2006-02-01 Well Log Performed
2006-02-02 Perforation Treatment Performed - Jet Perforation
2018-12-31 Well Fluid changed to Gas
2018-12-31 Well Mode changed to Suspended
2020-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-02 Perforation Treatment Performed - Jet Perforation
2020-03-02 Plug Back Performed
2020-03-02 Well Fluid changed to Gas
2020-03-02 Well Mode changed to Abandoned Zone
2020-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-03 Plug Back Performed
2020-03-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-08 Packing Device Capped w/Cement 600.00 608.00 0
1996-03-08 Perforation 595.00 597.00 14
2006-02-02 Perforation 599.00 599.50 17
2006-02-02 Perforation 472.00 473.00 17
2020-03-02 Packing Device Capped w/Cement 577.00 585.00 0
2020-03-02 Packing Device Capped w/Cement 461.00 469.00 0
2020-03-02 Perforation 219.00 220.00 20
2020-03-03 Acid Treatment 219.00 220.00 0
2020-03-03 Packing Device Capped w/Cement 203.00 211.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2399 0.0 0.0 0.0
1997 8744 0.0 0.0 0.0
1998 8749 0.0 0.0 0.0
1999 8745 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8551 0.0 0.0 0.0
2002 7978 0.0 0.0 0.0
2003 8652 0.0 0.0 0.0
2004 8782 0.0 0.0 0.0
2005 8422 0.0 0.0 0.0
2006 6577 0.0 0.0 0.0
2007 1031 0.0 0.0 0.0
2008 2764 0.0 0.0 0.0
2009 4002 0.0 0.0 0.0
2010 6166 0.0 0.0 0.0
2011 5592 0.0 0.0 0.0
2012 2854 0.0 0.0 0.0
2013 3044 0.0 0.0 0.0
2014 2784 0.0 0.0 0.0
2015 3189 0.0 0.0 0.0
2016 3441 0.0 0.0 0.0
2017 2830 0.0 0.0 0.0
2018 4834 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-03-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References