X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634131107002

Well Details

Well ID: 0634131107002
Loading map...
Location: 00/07-11-063-13W4/2
Location Alias: 00/07-11-63-13 W4M
Location Alias 2: 00/07-11-063-13 W4/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 13
Section: 11
County/Municipality: Lac La Biche County
Well Name: BVI ET AL CRAIGEND 7-11-63-13
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0035816
License Date: 1969-02-14
License Status: RecCertified
Spud Date: 1969-02-26
Final Drill Date: 1969-03-02
Well Total Depth: 565.70 m
Surface Hole Latitude: 54.431848
Surface Hole Longitude: -111.853142

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-02-14 Obtained License
1969-03-01 Drill Stem Test Performed
1969-03-02 Finished Drilling
1969-03-02 Well Mode changed to Drilled and Cased
1969-03-03 Drill Stem Test Performed
1969-03-04 Drill Stem Test Performed
1969-03-05 Production Casing Operation Performed
1969-06-03 Perforation Treatment Performed - Jet Perforation
1969-06-13 Perforation Treatment Performed - Fractured
1973-10-13 Perforation Treatment Performed - Cement Squeeze
1973-10-16 Perforation Treatment Performed - Jet Perforation
1973-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-10-30 Perforation Treatment Performed - Cement Squeeze
1973-11-02 Perforation Treatment Performed - Jet Perforation
1973-11-03 Well Began Production
1973-11-03 Well Fluid changed to Gas
1973-11-03 Well Mode changed to Flowing
1975-11-04 Well Fluid changed to Gas
1975-11-04 Well Mode changed to Suspended
1982-04-01 Well Fluid changed to Gas
1982-04-01 Well Mode changed to Flowing
1984-02-29 Well Fluid changed to Gas
1984-02-29 Well Mode changed to Suspended
1988-07-01 Well Fluid changed to Gas
1988-07-01 Well Mode changed to Flowing
1989-07-31 Well Fluid changed to Gas
1989-07-31 Well Mode changed to Suspended
1997-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-26 Perforation Treatment Performed - Jet Perforation
1997-07-26 Plug Back Performed
1997-07-26 Well Log Performed
1997-07-27 Well Log Performed
1997-08-19 Well Abandoned
1997-08-19 Well Fluid changed to Gas
1997-08-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-06-03 Perforation 538.90 541.00 7
1997-07-26 Packing Device Capped w/Cement 527.00 535.00 0
1997-07-26 Perforation 520.00 520.90 13
1997-07-26 Packing Device Capped w/Cement 502.00 510.00 0
1969-06-03 Perforation 541.60 542.50 7
1969-06-03 Perforation 545.90 547.40 7
1969-06-13 Fracture 538.90 547.40 0
1973-10-13 Cement Squeeze 538.90 547.40 0
1973-10-16 Perforation 538.90 540.10 7
1973-10-27 Acid Treatment 538.90 540.10 0
1973-10-30 Cement Squeeze 538.90 540.10 0
1973-11-02 Perforation 550.50 551.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 1272 0.0 0.0 0.0
1974 3239 0.0 0.0 0.0
1975 1584 0.0 0.0 0.0
1976 144 0.0 0.0 0.0
1977 1179 0.0 0.0 0.0
1978 641 0.0 0.0 0.0
1979 1038 0.0 0.0 0.0
1982 1084 0.0 0.0 0.0
1984 507 0.0 0.0 0.0
1986 381 0.0 0.0 0.0
1988 208 0.0 0.0 0.0
1989 90 0.0 0.0 0.0

For data sources see[5]

References