If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0634131107002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.431848,"lon":-111.853142,"icon":""}]} |
| Location: 00/07-11-063-13W4/2 | |
| Location Alias: 00/07-11-63-13 W4M | |
| Location Alias 2: 00/07-11-063-13 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 063 | |
| Meridian: 4 | |
| Range: 13 | |
| Section: 11 | |
| County/Municipality: Lac La Biche County | |
| Well Name: BVI ET AL CRAIGEND 7-11-63-13 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0035816 | |
| License Date: 1969-02-14 | |
| License Status: RecCertified | |
| Spud Date: 1969-02-26 | |
| Final Drill Date: 1969-03-02 | |
| Well Total Depth: 565.70 m | |
| Surface Hole Latitude: 54.431848 | |
| Surface Hole Longitude: -111.853142 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1969-02-14 | Obtained License |
| 1969-03-01 | Drill Stem Test Performed |
| 1969-03-02 | Finished Drilling |
| 1969-03-02 | Well Mode changed to Drilled and Cased |
| 1969-03-03 | Drill Stem Test Performed |
| 1969-03-04 | Drill Stem Test Performed |
| 1969-03-05 | Production Casing Operation Performed |
| 1969-06-03 | Perforation Treatment Performed - Jet Perforation |
| 1969-06-13 | Perforation Treatment Performed - Fractured |
| 1973-10-13 | Perforation Treatment Performed - Cement Squeeze |
| 1973-10-16 | Perforation Treatment Performed - Jet Perforation |
| 1973-10-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1973-10-30 | Perforation Treatment Performed - Cement Squeeze |
| 1973-11-02 | Perforation Treatment Performed - Jet Perforation |
| 1973-11-03 | Well Began Production |
| 1973-11-03 | Well Fluid changed to Gas |
| 1973-11-03 | Well Mode changed to Flowing |
| 1975-11-04 | Well Fluid changed to Gas |
| 1975-11-04 | Well Mode changed to Suspended |
| 1982-04-01 | Well Fluid changed to Gas |
| 1982-04-01 | Well Mode changed to Flowing |
| 1984-02-29 | Well Fluid changed to Gas |
| 1984-02-29 | Well Mode changed to Suspended |
| 1988-07-01 | Well Fluid changed to Gas |
| 1988-07-01 | Well Mode changed to Flowing |
| 1989-07-31 | Well Fluid changed to Gas |
| 1989-07-31 | Well Mode changed to Suspended |
| 1997-07-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-07-26 | Perforation Treatment Performed - Jet Perforation |
| 1997-07-26 | Plug Back Performed |
| 1997-07-26 | Well Log Performed |
| 1997-07-27 | Well Log Performed |
| 1997-08-19 | Well Abandoned |
| 1997-08-19 | Well Fluid changed to Gas |
| 1997-08-19 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1969-06-03 | Perforation | 538.90 | 541.00 | 7 |
| 1997-07-26 | Packing Device Capped w/Cement | 527.00 | 535.00 | 0 |
| 1997-07-26 | Perforation | 520.00 | 520.90 | 13 |
| 1997-07-26 | Packing Device Capped w/Cement | 502.00 | 510.00 | 0 |
| 1969-06-03 | Perforation | 541.60 | 542.50 | 7 |
| 1969-06-03 | Perforation | 545.90 | 547.40 | 7 |
| 1969-06-13 | Fracture | 538.90 | 547.40 | 0 |
| 1973-10-13 | Cement Squeeze | 538.90 | 547.40 | 0 |
| 1973-10-16 | Perforation | 538.90 | 540.10 | 7 |
| 1973-10-27 | Acid Treatment | 538.90 | 540.10 | 0 |
| 1973-10-30 | Cement Squeeze | 538.90 | 540.10 | 0 |
| 1973-11-02 | Perforation | 550.50 | 551.10 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1973 | 1272 | 0.0 | 0.0 | 0.0 |
| 1974 | 3239 | 0.0 | 0.0 | 0.0 |
| 1975 | 1584 | 0.0 | 0.0 | 0.0 |
| 1976 | 144 | 0.0 | 0.0 | 0.0 |
| 1977 | 1179 | 0.0 | 0.0 | 0.0 |
| 1978 | 641 | 0.0 | 0.0 | 0.0 |
| 1979 | 1038 | 0.0 | 0.0 | 0.0 |
| 1982 | 1084 | 0.0 | 0.0 | 0.0 |
| 1984 | 507 | 0.0 | 0.0 | 0.0 |
| 1986 | 381 | 0.0 | 0.0 | 0.0 |
| 1988 | 208 | 0.0 | 0.0 | 0.0 |
| 1989 | 90 | 0.0 | 0.0 | 0.0 |
For data sources see[5]