X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634120406002

Well Details

Well ID: 0634120406002
Loading map...
Location: 00/06-04-063-12W4/2
Location Alias: 00/06-04-63-12 W4M
Location Alias 2: 00/06-04-063-12 W4/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 12
Section: 04
County/Municipality: Lac La Biche County
Well Name: BVI ET AL CRAIGEND 6-4-63-12
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0036683
License Date: 1969-08-12
License Status: RecCertified
Spud Date: 1969-08-13
Final Drill Date: 1969-08-18
Well Total Depth: 565.40 m
Surface Hole Latitude: 54.417316
Surface Hole Longitude: -111.762589

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-08-12 Obtained License
1969-08-15 Drill Stem Test Performed
1969-08-18 Finished Drilling
1969-08-18 Well Mode changed to Drilled and Cased
1969-08-21 Production Casing Operation Performed
1969-09-16 Perforation Treatment Performed - Jet Perforation
1971-10-21 Perforation Treatment Performed - Jet Perforation
1971-12-10 Well Began Production
1971-12-10 Well Fluid changed to Gas
1971-12-10 Well Mode changed to Flowing
1984-03-15 Well Fluid changed to Gas
1984-03-15 Well Mode changed to Suspended
1998-03-07 Well Log Performed
1998-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-08 Plug Back Performed
1998-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-09 Perforation Treatment Performed - Jet Perforation
1998-03-09 Plug Back Performed
1998-03-09 Well Fluid changed to Gas
1998-03-09 Well Log Performed
1998-03-09 Well Mode changed to Abandoned Zone
1998-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-10 Well Log Performed
1998-10-28 Well Abandoned
1998-10-28 Well Fluid changed to Gas
1998-10-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-09-16 Perforation 537.10 537.70 7
1969-09-16 Perforation 537.70 538.30 13
1971-10-21 Perforation 550.80 551.70 7
1998-03-08 Packing Device Capped w/Cement 540.50 545.50 0
1998-03-09 Packing Device Capped w/Cement 535.50 540.50 0
1998-03-09 Packing Device Capped w/Cement 515.00 525.00 0
1998-03-09 Perforation 368.80 371.30 13
1998-03-09 Perforation 366.60 367.90 13
1998-03-10 Packing Device Capped w/Cement 347.00 355.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 528 0.0 0.0 0.0
1972 6504 0.0 0.0 0.0
1973 6959 0.0 0.0 0.0
1974 8352 0.0 0.0 0.0
1975 8480 0.0 0.0 0.0
1976 8409 0.0 0.0 0.0
1977 6308 0.0 0.0 0.0
1978 8382 0.0 0.0 0.0
1979 7270 0.0 0.0 0.0
1980 7584 0.0 0.0 0.0
1981 7956 0.0 0.0 0.0
1982 8142 0.0 0.0 0.0
1983 4495 0.0 0.0 0.0
1984 1284 0.0 0.0 0.0

For data sources see[5]

References