If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626073301022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.391398,"lon":-118.961833,"icon":""}]} |
| Location: 02/01-33-062-07W6/2 | |
| Location Alias: 02/01-33-62-07 W6M | |
| Location Alias 2: 02/01-33-062-07 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 33 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: JUPITER ROUTE 1-33-62-7 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0443657 | |
| License Date: 2012-02-01 | |
| License Status: Amended | |
| Spud Date: 2012-07-22 | |
| Final Drill Date: 2012-08-29 | |
| Well Total Depth: 3713.00 m | |
| Surface Hole Latitude: 54.391398 | |
| Surface Hole Longitude: -118.961833 |
| Date | Event |
|---|---|
| 2012-02-01 | Obtained License |
| 2012-07-25 | Surface Casing Operation Performed |
| 2012-08-09 | Direction Drilling Operation Performed - Sidetrack Fish |
| 2012-08-15 | Well Log Performed |
| 2012-08-16 | Well Log Performed |
| 2012-08-17 | Intermediate Casing Operation Performed |
| 2012-08-29 | Finished Drilling |
| 2012-08-29 | Well Log Performed |
| 2012-08-29 | Well Mode changed to Drilled and Cased |
| 2012-08-30 | Well Log Performed |
| 2012-08-31 | Production Casing Operation Performed |
| 2012-09-01 | Rig Released |
| 2012-10-31 | Well Log Performed |
| 2012-11-08 | Perforation Treatment Performed - Jet Perforation |
| 2012-11-08 | Well Log Performed |
| 2012-11-11 | Perforation Treatment Performed - Fractured |
| 2012-11-12 | Perforation Treatment Performed - Jet Perforation |
| 2012-11-12 | Well Fluid changed to Gas |
| 2012-11-12 | Well Log Performed |
| 2012-11-12 | Well Mode changed to Testing |
| 2012-11-13 | Perforation Treatment Performed - Fractured |
| 2012-11-13 | Perforation Treatment Performed - Jet Perforation |
| 2012-11-13 | Well Log Performed |
| 2012-11-14 | Perforation Treatment Performed - Fractured |
| 2012-11-15 | Well Log Performed |
| 2012-11-19 | Well Log Performed |
| 2012-11-20 | Perforation Treatment Performed - Jet Perforation |
| 2012-11-20 | Well Log Performed |
| 2012-12-01 | Perforation Treatment Performed - Fractured |
| 2012-12-01 | Perforation Treatment Performed - Jet Perforation |
| 2012-12-01 | Well Log Performed |
| 2012-12-03 | Perforation Treatment Performed - Fractured |
| 2013-02-12 | Well Fluid changed to Gas |
| 2013-02-12 | Well Mode changed to Test Completed |
| 2013-02-14 | Well Began Production |
| 2013-02-14 | Well Fluid changed to Gas |
| 2013-02-14 | Well Mode changed to Flowing |
| 2014-10-01 | Well Fluid changed to Gas |
| 2014-10-01 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-08-09 | 1710.00 | Sidetrack fish |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-11-08 | Perforation | 3688.00 | 3692.00 | 10 |
| 2012-11-13 | Fracture | 3601.00 | 3673.00 | 0 |
| 2012-11-14 | Fracture | 3327.50 | 3329.00 | 0 |
| 2012-11-20 | Perforation | 3212.00 | 3214.00 | 10 |
| 2012-11-20 | Perforation | 3220.00 | 3222.00 | 10 |
| 2012-12-01 | Perforation | 2921.00 | 2922.50 | 10 |
| 2012-12-01 | Perforation | 2939.00 | 2939.50 | 10 |
| 2012-12-01 | Perforation | 2985.00 | 2987.00 | 10 |
| 2012-12-01 | Fracture | 3212.00 | 3222.00 | 0 |
| 2012-12-03 | Fracture | 2921.00 | 2987.00 | 0 |
| 2012-11-11 | Fracture | 3688.00 | 3692.00 | 0 |
| 2012-11-12 | Perforation | 3601.00 | 3602.00 | 10 |
| 2012-11-12 | Perforation | 3670.00 | 3673.00 | 10 |
| 2012-11-13 | Perforation | 3327.50 | 3329.00 | 20 |
| 2012-11-13 | Perforation | 3472.00 | 3473.00 | 10 |
| 2012-11-13 | Perforation | 3476.00 | 3478.00 | 10 |
| 2012-11-13 | Perforation | 3491.00 | 3492.00 | 10 |
| 2012-11-13 | Fracture | 3472.00 | 3492.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 126 | 0.0 | 0.0 | 0.0 |
| 2013 | 4136 | 0.0 | 0.0 | 0.0 |
| 2014 | 8279 | 0.0 | 0.0 | 0.0 |
| 2015 | 8420 | 0.0 | 0.0 | 0.0 |
| 2016 | 1632 | 0.0 | 0.0 | 0.0 |
| 2017 | 2448 | 0.0 | 0.0 | 0.0 |
| 2018 | 3007 | 0.0 | 0.0 | 0.0 |
| 2019 | 557 | 0.0 | 0.0 | 0.0 |
| 2020 | 1989 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-08-29 | No Incident Encountered | 0.00 | 0.00 |
| 2012-12-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]