X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626072116030

Well Details

Well ID: 0626072116030
Loading map...
Location: 03/16-21-062-07W6/0
Location Alias: 03/16-21-62-07 W6M
Location Alias 2: 03/16-21-062-07 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 07
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER 102 ROUTE 16-21-62-7
Operator Name: Jupiter Resources Inc.
License Number: 0443630
License Date: 2012-02-01
License Status: Amended
Spud Date: 2012-09-03
Final Drill Date: 2012-09-19
Well Total Depth: 3709.50 m
Surface Hole Latitude: 54.391398
Surface Hole Longitude: -118.961694

For data sources see[1][2]

Well History

Date Event
2012-02-01 Obtained License
2012-09-03 Direction Drilling Operation Performed - Deviate
2012-09-06 Surface Casing Operation Performed
2012-09-13 Intermediate Casing Operation Performed
2012-09-19 Finished Drilling
2012-09-19 Well Mode changed to Drilled and Cased
2012-09-20 Well Log Performed
2012-09-21 Production Casing Operation Performed
2012-09-21 Rig Released
2012-10-31 Well Log Performed
2012-11-08 Perforation Treatment Performed - Jet Perforation
2012-11-08 Well Log Performed
2012-11-11 Perforation Treatment Performed - Fractured
2012-11-14 Perforation Treatment Performed - Fractured
2012-11-14 Perforation Treatment Performed - Jet Perforation
2012-11-14 Well Fluid changed to Gas
2012-11-14 Well Log Performed
2012-11-14 Well Mode changed to Testing
2012-11-15 Perforation Treatment Performed - Fractured
2012-11-15 Perforation Treatment Performed - Jet Perforation
2012-11-15 Well Log Performed
2012-12-02 Perforation Treatment Performed - Fractured
2012-12-02 Perforation Treatment Performed - Jet Perforation
2012-12-02 Well Log Performed
2012-12-04 Perforation Treatment Performed - Fractured
2012-12-04 Perforation Treatment Performed - Jet Perforation
2012-12-04 Well Log Performed
2012-12-05 Perforation Treatment Performed - Fractured
2013-02-12 Well Fluid changed to Gas
2013-02-12 Well Mode changed to Test Completed
2013-03-07 Well Began Production
2013-03-07 Well Fluid changed to Gas
2013-03-07 Well Mode changed to Flowing
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-09-03 183.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-08 Perforation 3690.00 3692.00 10
2012-11-15 Perforation 3320.00 3322.00 10
2012-11-15 Perforation 3211.00 3214.00 10
2012-11-15 Fracture 3428.50 3487.00 0
2012-11-15 Fracture 3320.00 3339.00 0
2012-12-02 Perforation 2996.00 2997.00 10
2012-12-02 Perforation 2924.50 2926.50 10
2012-12-02 Perforation 2911.00 2912.00 10
2012-12-02 Fracture 3211.00 3214.00 0
2012-12-04 Perforation 2279.50 2283.50 10
2012-12-04 Fracture 2911.00 2997.00 0
2012-11-11 Fracture 3690.00 3692.00 0
2012-12-05 Fracture 2279.50 2283.50 0
2012-11-14 Perforation 3581.00 3583.00 20
2012-11-14 Perforation 3486.00 3487.00 10
2012-11-14 Perforation 3474.50 3476.00 10
2012-11-14 Perforation 3465.50 3466.50 10
2012-11-14 Perforation 3428.50 3429.00 10
2012-11-14 Fracture 3581.00 3583.00 0
2012-11-15 Perforation 3338.00 3339.00 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 85 0.0 0.0 0.0
2013 3903 0.0 0.0 0.0
2014 8375 0.0 0.0 0.0
2015 8396 0.0 0.0 0.0
2016 1656 0.0 0.0 0.0
2017 3188 0.0 0.0 0.0
2018 96 0.0 0.0 0.0
2019 535 0.0 0.0 0.0
2020 2047 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-22 No Incident Encountered 0.00 0.00
2012-12-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References