X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626071315020

Well Details

Well ID: 0626071315020
Loading map...
Location: 02/15-13-062-07W6/0
Location Alias: 02/15-13-62-07 W6M
Location Alias 2: 02/15-13-062-07 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 07
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ KAKWA 15-13-62-7
Operator Name: Jupiter Resources Inc.
License Number: 0470287
License Date: 2014-09-30
License Status: Amended
Spud Date: 2014-10-24
Final Drill Date: 2014-11-28
Well Total Depth: 5608.00 m
Surface Hole Latitude: 54.344793
Surface Hole Longitude: -118.893093

For data sources see[1][2]

Well History

Date Event
2014-09-30 Obtained License
2014-10-26 Surface Casing Operation Performed
2014-10-29 Lost Circulation Occurred
2014-11-03 Direction Drilling Operation Performed - Deviate
2014-11-14 Direction Drilling Operation Performed - Horizontal
2014-11-16 Intermediate Casing Operation Performed
2014-11-28 Finished Drilling
2014-11-28 Well Log Performed
2014-11-28 Well Mode changed to Drilled and Cased
2014-12-01 Liner Casing Operation Performed
2014-12-04 Rig Released
2015-01-30 Well Log Performed
2015-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-02 Well Began Production
2015-03-02 Well Fluid changed to Crude Oil
2015-03-02 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-11-03 720.70 Deviate (5 - 79 degrees)
2014-11-14 2864.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-08 Multi-Stage Fracture 5580.20 5580.30 0
2015-02-21 Multi-Stage Fracture 4795.30 4795.40 0
2015-02-22 Multi-Stage Fracture 4708.60 4708.70 0
2015-02-22 Multi-Stage Fracture 4610.40 4610.50 0
2015-02-22 Multi-Stage Fracture 4524.00 4524.10 0
2015-02-22 Multi-Stage Fracture 4437.00 4437.10 0
2015-02-22 Multi-Stage Fracture 4349.90 4350.00 0
2015-02-22 Multi-Stage Fracture 4250.90 4251.00 0
2015-02-22 Multi-Stage Fracture 4165.10 4165.20 0
2015-02-22 Multi-Stage Fracture 4077.40 4077.50 0
2015-02-22 Multi-Stage Fracture 3990.50 3990.60 0
2015-02-08 Multi-Stage Fracture 5510.10 5510.20 0
2015-02-22 Multi-Stage Fracture 3890.50 3890.60 0
2015-02-22 Multi-Stage Fracture 3803.00 3803.10 0
2015-02-22 Multi-Stage Fracture 3717.40 3717.50 0
2015-02-23 Multi-Stage Fracture 3630.10 3630.20 0
2015-02-23 Multi-Stage Fracture 3531.80 3531.90 0
2015-02-23 Multi-Stage Fracture 3445.80 3445.90 0
2015-02-23 Multi-Stage Fracture 3349.80 3349.90 0
2015-02-23 Multi-Stage Fracture 3253.20 3253.30 0
2015-02-23 Multi-Stage Fracture 3131.40 3131.50 0
2015-02-23 Multi-Stage Fracture 3034.60 3034.70 0
2015-02-08 Multi-Stage Fracture 5423.40 5423.50 0
2015-02-08 Multi-Stage Fracture 5336.60 5336.70 0
2015-02-08 Multi-Stage Fracture 5250.00 5250.10 0
2015-02-08 Multi-Stage Fracture 5152.20 5152.30 0
2015-02-09 Multi-Stage Fracture 5065.20 5065.30 0
2015-02-09 Multi-Stage Fracture 4979.30 4979.40 0
2015-02-21 Multi-Stage Fracture 4881.90 4882.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-02-08 2015-02-23 2,699 11,723 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.5758 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.3845 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.5514 N/A
Oil Plus Calfrac Quartz 14808-60-7 100 3.3254 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0126 N/A
Water 7732-18-5 100 0.0128 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0911 N/A
Ethoxylated phenolic resin 8300 100 0.0923 N/A
Isobutyl ketone 8300 100 0.0913 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0979 N/A
Organic acid salts 1 8300 100 0.0911 N/A
Organic acid salts 2 8300 100 0.0917 N/A
Organic acid salts 3 8300 100 0.0923 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0845 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-02-07 2015-02-23 Surface Water - Runoff 8834
2015-02-08 2015-02-23 Recycled Fracturing Water (treated at well site) 1292
2015-02-07 2015-02-23 Central Water Distribution Facility 1615

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3947 0.0 0.0 0.0
2016 7960 0.0 0.0 0.0
2017 3338 0.0 0.0 0.0
2018 7398 0.0 0.0 0.0
2019 8414 0.0 0.0 0.0
2020 2063 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-29 Lost Circulation 649.00 667.00
2015-03-17 No Incident Encountered 0.00 0.00

For data sources see[9]

References