X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626061204000

Well Details

Well ID: 0626061204000
Loading map...
Location: 00/04-12-062-06W6/0
Location Alias: 00/04-12-62-06 W6M
Location Alias 2: 00/04-12-062-06 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 06
Section: 12
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ KAKWA 4-12-62-6
Operator Name: Tourmaline Oil Corp.
License Number: 0482166
License Date: 2017-01-03
License Status: Issued
Spud Date: 2017-01-05
Final Drill Date: 2017-01-26
Well Total Depth: 4510.00 m
Surface Hole Latitude: 54.341910
Surface Hole Longitude: -118.748569

For data sources see[1][2]

Well History

Date Event
2016-01-26 Well Log Performed
2017-01-03 Obtained License
2017-01-07 Surface Casing Operation Performed
2017-01-13 Intermediate Casing Operation Performed
2017-01-16 Direction Drilling Operation Performed - Deviate
2017-01-18 Direction Drilling Operation Performed - Horizontal
2017-01-18 Well Log Performed
2017-01-26 Finished Drilling
2017-01-26 Well Log Performed
2017-01-26 Well Mode changed to Drilled and Cased
2017-01-28 Production Casing Operation Performed
2017-01-28 Rig Released
2017-02-02 Well Log Performed
2017-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-12 Well Began Production
2017-02-12 Well Fluid changed to Gas
2017-02-12 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-05 Citadel Drilling Ltd. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-16 2864.80 Deviate (5 - 79 degrees)
2017-01-18 3151.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-02-10 Multi-Stage Fracture 4466.10 4466.20 0
2017-02-10 Multi-Stage Fracture 3989.20 3989.30 0
2017-02-10 Multi-Stage Fracture 3936.40 3936.50 0
2017-02-10 Multi-Stage Fracture 3883.60 3883.70 0
2017-02-10 Multi-Stage Fracture 3830.80 3830.90 0
2017-02-11 Multi-Stage Fracture 3778.00 3778.10 0
2017-02-11 Multi-Stage Fracture 3725.20 3725.30 0
2017-02-11 Multi-Stage Fracture 3672.30 3672.40 0
2017-02-11 Multi-Stage Fracture 3619.50 3619.60 0
2017-02-11 Multi-Stage Fracture 3566.70 3566.80 0
2017-02-11 Multi-Stage Fracture 3513.90 3514.00 0
2017-02-10 Multi-Stage Fracture 4411.70 4411.80 0
2017-02-11 Multi-Stage Fracture 3461.30 3461.40 0
2017-02-11 Multi-Stage Fracture 3408.50 3408.60 0
2017-02-11 Multi-Stage Fracture 3355.70 3355.80 0
2017-02-11 Multi-Stage Fracture 3302.90 3303.00 0
2017-02-11 Multi-Stage Fracture 3250.10 3250.20 0
2017-02-11 Multi-Stage Fracture 3184.60 3184.70 0
2017-02-10 Multi-Stage Fracture 4358.80 4358.90 0
2017-02-10 Multi-Stage Fracture 4306.00 4306.10 0
2017-02-10 Multi-Stage Fracture 4253.20 4253.30 0
2017-02-10 Multi-Stage Fracture 4200.40 4200.50 0
2017-02-10 Multi-Stage Fracture 4147.60 4147.70 0
2017-02-10 Multi-Stage Fracture 4094.80 4094.90 0
2017-02-10 Multi-Stage Fracture 4042.00 4042.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-10 2017-02-11 3,056 7,199 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.968 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 2.8096 N/A
silica crystalline 14808-60-7 100 2.8096 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.6972 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.2971 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0108 N/A
2-mercaptoethanol 60-24-2 100 0.0108 N/A
dibromoacetonitrile 3252-43-5 100 0.0108 N/A
non-hazardous ingredients Not Available 100 0.0108 N/A
sodium bromide 7647-15-6 100 0.0108 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.09 N/A
water Not Available 100 0.09 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0822 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0822 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0822 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0822 N/A
non-hazardous ingredients Not Available 100 0.0822 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0447 N/A
methanol 67-56-1 100 0.0447 N/A
water Not Available 100 0.0447 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-02-02 2017-02-02 Recycled Fracturing Water (treated at well site) 2570
2017-02-02 2017-02-02 Municipal Water 50
2017-02-01 2017-02-03 Surface Water - Lake 4579

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 7673 0.0 0.0 0.0
2018 8257 0.0 0.0 0.0
2019 8602 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-26 No Incident Encountered 0.00 0.00
2017-02-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References