If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0626061104020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.355306,"lon":-118.810027,"icon":""}]} |
Location: 02/04-11-062-06W6/0 | |
Location Alias: 02/04-11-62-06 W6M | |
Location Alias 2: 02/04-11-062-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 6 | |
Range: 06 | |
Section: 11 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE HZ 102 KAKWA 4-11-62-6 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0493731 | |
License Date: 2019-02-08 | |
License Status: Issued | |
Spud Date: 2019-02-10 | |
Final Drill Date: 2019-03-16 | |
Well Total Depth: 4410.00 m | |
Surface Hole Latitude: 54.355306 | |
Surface Hole Longitude: -118.810027 |
Date | Event |
---|---|
2019-02-08 | Obtained License |
2019-02-11 | Surface Casing Operation Performed |
2019-02-28 | Intermediate Casing Operation Performed |
2019-03-01 | Direction Drilling Operation Performed - Deviate |
2019-03-06 | Direction Drilling Operation Performed - Horizontal |
2019-03-06 | Well Log Performed |
2019-03-16 | Finished Drilling |
2019-03-16 | Well Log Performed |
2019-03-16 | Well Mode changed to Drilled and Cased |
2019-03-17 | Production Casing Operation Performed |
2019-03-18 | Rig Released |
2019-05-31 | Well Log Performed |
2019-06-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-08 | Well Began Production |
2019-06-08 | Well Fluid changed to Gas |
2019-06-08 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-03-01 | Precision Drilling Corporation | 531 | N/A | Resumption |
2019-02-10 | Precision Drilling Corporation | 531 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-03-01 | 1838.80 | Deviate (5 - 79 degrees) |
2019-03-06 | 3208.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-06-06 | Multi-Stage Fracture | 4357.10 | 4357.20 | 0 |
2019-06-07 | Multi-Stage Fracture | 3880.20 | 3880.30 | 0 |
2019-06-07 | Multi-Stage Fracture | 3776.80 | 3776.90 | 0 |
2019-06-07 | Multi-Stage Fracture | 3723.90 | 3724.00 | 0 |
2019-06-07 | Multi-Stage Fracture | 3671.10 | 3671.20 | 0 |
2019-06-07 | Multi-Stage Fracture | 3618.30 | 3618.40 | 0 |
2019-06-07 | Multi-Stage Fracture | 3565.40 | 3565.50 | 0 |
2019-06-07 | Multi-Stage Fracture | 3512.50 | 3512.60 | 0 |
2019-06-07 | Multi-Stage Fracture | 3459.60 | 3459.70 | 0 |
2019-06-07 | Multi-Stage Fracture | 3406.80 | 3406.90 | 0 |
2019-06-07 | Multi-Stage Fracture | 3353.90 | 3354.00 | 0 |
2019-06-06 | Multi-Stage Fracture | 4302.70 | 4302.80 | 0 |
2019-06-07 | Multi-Stage Fracture | 3301.10 | 3301.20 | 0 |
2019-06-07 | Multi-Stage Fracture | 3260.90 | 3261.00 | 0 |
2019-06-07 | Multi-Stage Fracture | 4249.80 | 4249.90 | 0 |
2019-06-07 | Multi-Stage Fracture | 4197.00 | 4197.10 | 0 |
2019-06-07 | Multi-Stage Fracture | 4144.20 | 4144.30 | 0 |
2019-06-07 | Multi-Stage Fracture | 4091.30 | 4091.40 | 0 |
2019-06-07 | Multi-Stage Fracture | 4038.50 | 4038.60 | 0 |
2019-06-07 | Multi-Stage Fracture | 3985.70 | 3985.80 | 0 |
2019-06-07 | Multi-Stage Fracture | 3932.80 | 3932.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-06-06 | 2019-06-07 | 3,099 | 5,203 | N/A |
2 | 2019-06-07 | 2019-06-07 | 3,099 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 83.0382 | N/A | |||
Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 3.3394 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 3.3394 | N/A | ||||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 11.7261 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.7071 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0106 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0106 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0106 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0106 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0106 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0894 | N/A | |
water | Not Available | 100 | 0.0894 | N/A | ||||
FR-22 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0467 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0467 | N/A | ||||
S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0405 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0405 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0405 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0405 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0405 | N/A | ||||
2 | NMR-1N | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.0156 | N/A |
non-hazardous ingredients | Not Available | 100 | 0.0156 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-06-06 | 2019-06-07 | Surface Water - Runoff | 5203 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 4839 | 0.0 | 0.0 | 0.0 |
2020 | 2163 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-03-16 | No Incident Encountered | 0.00 | 0.00 |
2019-06-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]