If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0626060614000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.323493,"lon":-118.857993,"icon":""}]} |
Location: 00/14-06-062-06W6/0 | |
Location Alias: 00/14-06-62-06 W6M | |
Location Alias 2: 00/14-06-062-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 6 | |
Range: 06 | |
Section: 06 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: JUPITER HZ KAKWA 14-6-62-6 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0442181 | |
License Date: 2012-01-03 | |
License Status: Amended | |
Spud Date: 2012-04-29 | |
Final Drill Date: 2012-06-06 | |
Well Total Depth: 5857.00 m | |
Surface Hole Latitude: 54.323493 | |
Surface Hole Longitude: -118.857993 |
Date | Event |
---|---|
2012-01-03 | Obtained License |
2012-04-30 | Direction Drilling Operation Performed - Deviate |
2012-05-02 | Surface Casing Operation Performed |
2012-05-09 | Lost Circulation Occurred |
2012-05-16 | Intermediate Casing Operation Performed |
2012-05-22 | Direction Drilling Operation Performed - Horizontal |
2012-06-06 | Finished Drilling |
2012-06-06 | Perforation Treatment Performed - Open-Hole Completion |
2012-06-06 | Well Log Performed |
2012-06-06 | Well Mode changed to Drilled and Cased |
2012-06-10 | Production Casing Operation Performed |
2012-06-12 | Rig Released |
2012-08-15 | Well Log Performed |
2012-08-16 | Well Fluid changed to Gas |
2012-08-16 | Well Mode changed to Testing |
2012-08-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-31 | Well Began Production |
2012-08-31 | Well Fluid changed to Gas |
2012-08-31 | Well Mode changed to Flowing |
2015-04-22 | Well Fluid changed to Gas |
2015-04-22 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-04-29 | Precision Drilling Corporation | 520 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-04-30 | 199.60 | Deviate (5 - 79 degrees) |
2012-05-22 | 3346.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-06-06 | Open Hole/Barefoot Completion | 5804.00 | 5857.00 | 0 |
2012-08-25 | Multi-Stage Fracture | 4547.70 | 4548.50 | 0 |
2012-08-25 | Multi-Stage Fracture | 4385.10 | 4385.90 | 0 |
2012-08-25 | Multi-Stage Fracture | 4234.60 | 4235.40 | 0 |
2012-08-25 | Multi-Stage Fracture | 4084.10 | 4084.90 | 0 |
2012-08-26 | Multi-Stage Fracture | 3921.60 | 3922.40 | 0 |
2012-08-26 | Multi-Stage Fracture | 3783.30 | 3784.10 | 0 |
2012-08-26 | Multi-Stage Fracture | 3620.70 | 3621.50 | 0 |
2012-08-26 | Multi-Stage Fracture | 3458.70 | 3459.50 | 0 |
2012-08-23 | Multi-Stage Fracture | 5780.40 | 5781.70 | 0 |
2012-08-23 | Multi-Stage Fracture | 5623.10 | 5623.90 | 0 |
2012-08-23 | Multi-Stage Fracture | 5472.70 | 5473.50 | 0 |
2012-08-24 | Multi-Stage Fracture | 5310.70 | 5311.50 | 0 |
2012-08-24 | Multi-Stage Fracture | 5160.80 | 5161.60 | 0 |
2012-08-24 | Multi-Stage Fracture | 5011.00 | 5011.80 | 0 |
2012-08-24 | Multi-Stage Fracture | 4848.40 | 4849.20 | 0 |
2012-08-24 | Multi-Stage Fracture | 4698.10 | 4698.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2581 | 0.0 | 0.0 | 0.0 |
2013 | 5528 | 0.0 | 0.0 | 0.0 |
2014 | 7950 | 0.0 | 0.0 | 0.0 |
2015 | 8233 | 0.0 | 0.0 | 0.0 |
2016 | 7819 | 0.0 | 0.0 | 0.0 |
2017 | 6977 | 0.0 | 0.0 | 0.0 |
2018 | 7759 | 0.0 | 0.0 | 0.0 |
2019 | 5541 | 0.0 | 0.0 | 0.0 |
2020 | 2160 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-09 | Lost Circulation | 1815.00 | 1815.00 |
2012-09-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]